Top NASA engineering contractors (NAICS 541330)
- Latest 12 months
- $639.5M
- Net obligations · Down $100.2M vs. $739.7M preceding
- Prime contractors
- 106
- With positive obligations in the latest 12 months
Research the NASA federal contracting market for engineering under NAICS 541330. Compare top federal contractors and market share, reported contract obligations and spending trends, funding-office attribution, recent award activity, contract types, competition, and procurement methods, observed contract vehicle usage, and potential recompete research leads.
Contract obligation trends for NASA engineering services
Federal records show $3.6B in net obligations across 1,851 awards in NASA engineering services from Oct 1, 2021 through Oct 23, 2026. This market accounts for 4.7% of $76.3B in agency-wide net prime contract obligations over the period shown. Latest 12-month net obligations decreased 13.5% from $739.7M to $639.5M. 14 prime contractors accounted for at least 80% of positive obligations in that latest period.
Fiscal-year activity
FY27 is year-to-date through Oct 23, 2026; earlier years show complete fiscal-year totals.
View fiscal-year data table
| Fiscal year | Net obligations | Contract actions | Coverage |
|---|---|---|---|
| FY2022 | $683.7M | 1,565 | Complete |
| FY2023 | $766.7M | 1,438 | Complete |
| FY2024 | $764.8M | 1,343 | Complete |
| FY2025 | $759.5M | 1,378 | Complete |
| FY2026 | $631.8M | 1,095 | Complete |
Market at a glance
All reported prime contract awards- All-period net obligations
- $3.6B
- 1,851 awards · 329 prime contractors
- Latest 12-month movement
- −13.5%
- $639.5M vs. $739.7M
- Leading eight prime share
- 65.9%
- Share held by the eight leading prime contractors in the latest 12 months
View agency share, denominators, and set-aside reporting
- Agency context
- 4.7% of $76.3B in agency-wide net obligations.
- Set-aside share when reported
- 12.3% of 632 awards with reported set-aside status.
- Set-aside reporting
- 78 set aside · 554 no set-aside · 1,219 not reported
What changed in the last 12 months?
Oct 24, 2025–Oct 23, 2026, compared with Oct 24, 2024–Oct 23, 2025.
Buyer demand
Reported obligations through NASA MARSHALL SPACE FLIGHT CENTER increased
Competitive shifts
JACOBS ENGINEERING GROUP INC. climbed the most in the contractor rankings
METIS TECHNOLOGY SOLUTIONS, INC. fell the most in the contractor rankings
PERATON INC. had the largest decline in reported obligations
TESLA LABORATORIES INC. had the largest increase in reported obligations
View 2 additional material changes
Competitive shifts
15 contractors were first observed in this market during the latest 12 months
View 15 contractors
- THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLCFirst observed May 28, 2026 in this market$1.5M
- LOCKHEED MARTIN CORPFirst observed May 27, 2026 in this market$1.5M
- REGENTS OF THE UNIVERSITY OF MICHIGANFirst observed May 28, 2026 in this market$1.4M
- HORIBA INSTRUMENTS INCORPORATEDFirst observed Jan 22, 2026 in this market$1.0M
- AALYRIA TECHNOLOGIES, INC.First observed Apr 14, 2026 in this market$710K
- ODYSSEY SPACE, LLCFirst observed Dec 2, 2025 in this market$421K
- SPARC RESEARCH LLCFirst observed Mar 24, 2026 in this market$350K
- OMP INCFirst observed Nov 26, 2025 in this market$337K
- ORBIT FAB, INCFirst observed Dec 16, 2025 in this market$200K
- MEYER TOOL & MANUFACTURING, INC.First observed Jun 15, 2026 in this market$123K
- FAISAL KARMALIFirst observed Feb 3, 2026 in this market$82K
- WELCH MECHANICAL DESIGNS, LLCFirst observed Feb 19, 2026 in this market$59K
- LEAPFAST MANUFACTURING INC.First observed Jul 27, 2026 in this market$43K
- SOURCE 44 LLCFirst observed Apr 7, 2026 in this market$20K
- SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC.First observed May 12, 2026 in this market<$1
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION lost the most market share
How these findings are calculated
Findings are selected from matched-period changes in obligations, share, rank, funding offices, concentration, reported set-asides, material award actions, and agency-peer outliers. Related signals are combined, and only material evidence-backed changes are shown. Review the full methodology.
Federal contract obligations by funding office
See how positive obligations were attributed across funding offices in the 12 months ending Oct 23, 2026.
52.4% of positive obligations were attributed to NASA GODDARD SPACE FLIGHT CENTER. That represents $335.1M, down $72.2M from the preceding 12 months.
Latest 12-month share of positive obligations; the gray segment represents all other reported offices.
- NASA GODDARD SPACE FLIGHT CENTER52.4% · $335.1M · down $72.2M
- NASA JOHNSON SPACE CENTER17.0% · $108.9M · down $18.0M
- NASA KENNEDY SPACE CENTER11.0% · $70.1M · up $9.1M
- NASA MARSHALL SPACE FLIGHT CENTER7.6% · $48.7M · up $9.7M
- NASA HEADQUARTERS3.5% · $22.3M · down $6.3M
- All other reported offices8.5% of positive obligations
View reported office rankings, comparisons, and evidence
USAspending assigns each award to a funding office. That office may differ from the requiring activity, program office, contracting office, individual buyer, or actual customer.
Reported funding office
NASA GODDARD SPACE FLIGHT CENTER
#1Rank unchangedLatest 12 months
$335.1M
52.4% of positive obligations
Versus preceding 12 months
−$72.2M
25 active prime contractors · 40 awards
View office comparison and evidence
Reported obligations decreased 17.7% from $407.3M to $335.1M. The office’s share of positive obligations moved from 55.1% to 52.4%, a change of −2.7 percentage points.
The latest period contains 204 actions across 40 awards and 6 newly active prime contractors. The preceding period contained 27 active prime contractors and 45 awards.
Leading award-level changes
- PERATON INC. · PIID 80GSFC19C0060−$28.7M: $44.2M → $15.5M
- KBR WYLE SERVICES, LLC · PIID 80GSFC22CA020−$23.3M: $155.2M → $131.9M
Reported funding office
NASA JOHNSON SPACE CENTER
#2Rank unchangedLatest 12 months
$108.9M
17.0% of positive obligations
Versus preceding 12 months
−$18.0M
14 active prime contractors · 97 awards
View office comparison and evidence
Reported obligations decreased 14.2% from $126.8M to $108.9M. The office’s share of positive obligations moved from 17.1% to 17.0%, a change of −0.1 percentage points.
The latest period contains 287 actions across 97 awards and 2 newly active prime contractors. The preceding period contained 13 active prime contractors and 117 awards.
Reported funding office
NASA KENNEDY SPACE CENTER
#3Rank unchangedLatest 12 months
$70.1M
11.0% of positive obligations
Versus preceding 12 months
+$9.1M
16 active prime contractors · 64 awards
View office comparison and evidence
Reported obligations increased 14.9% from $61.0M to $70.1M. The office’s share of positive obligations moved from 8.3% to 11.0%, a change of +2.7 percentage points.
The latest period contains 159 actions across 64 awards and 2 newly active prime contractors. The preceding period contained 21 active prime contractors and 90 awards.
Reported funding office
NASA MARSHALL SPACE FLIGHT CENTER
#4Rank unchangedLatest 12 months
$48.7M
7.6% of positive obligations
Versus preceding 12 months
+$9.7M
16 active prime contractors · 102 awards
View office comparison and evidence
Reported obligations increased 24.8% from $39.0M to $48.7M. The office’s share of positive obligations moved from 5.3% to 7.6%, a change of +2.3 percentage points.
The latest period contains 187 actions across 102 awards and 4 newly active prime contractors. The preceding period contained 15 active prime contractors and 94 awards.
Leading award-level changes
- VICTORY SOLUTIONS, LLC · PIID NNM13AA66T−$13.8M: $16.7M → $2.9M
- VICTORY SOLUTIONS, LLC · PIID 80MSFC26F0003+$8.2M: $0 → $8.2M
Reported funding office
NASA HEADQUARTERS
#5Up 1 from #6Latest 12 months
$22.3M
3.5% of positive obligations
Versus preceding 12 months
−$6.3M
2 active prime contractors · 28 awards
View office comparison and evidence
Reported obligations decreased 22.1% from $28.7M to $22.3M. The office’s share of positive obligations moved from 3.9% to 3.5%, a change of −0.4 percentage points.
The latest period contains 45 actions across 28 awards. The preceding period contained 6 active prime contractors and 39 awards.
Reported funding office
NASA IT PROCUREMENT OFFICE
#6Down 1 from #5Latest 12 months
$19.4M
3.0% of positive obligations
Versus preceding 12 months
−$14.8M
2 active prime contractors · 2 awards
View office comparison and evidence
Reported obligations decreased 43.3% from $34.3M to $19.4M. The office’s share of positive obligations moved from 4.6% to 3.0%, a change of −1.6 percentage points.
The latest period contains 9 actions across 2 awards and 1 newly active prime contractor. The preceding period contained 1 active prime contractor and 1 award.
Reported funding office
NASA AMES RESEARCH CENTER
#7Rank unchangedLatest 12 months
$12.7M
2.0% of positive obligations
Versus preceding 12 months
−$8.4M
15 active prime contractors · 27 awards
View office comparison and evidence
Reported obligations decreased 39.9% from $21.1M to $12.7M. The office’s share of positive obligations moved from 2.9% to 2.0%, a change of −0.9 percentage points.
The latest period contains 64 actions across 27 awards and 4 newly active prime contractors. The preceding period contained 16 active prime contractors and 29 awards.
Reported funding office
NASA GLENN RESEARCH CENTER
#8Up 2 from #10Latest 12 months
$11.2M
1.8% of positive obligations
Versus preceding 12 months
+$6.5M
11 active prime contractors · 23 awards
View office comparison and evidence
Reported obligations increased 141.0% from $4.6M to $11.2M. The office’s share of positive obligations moved from 0.63% to 1.8%, a change of +1.1 percentage points.
The latest period contains 31 actions across 23 awards and 1 newly active prime contractor. The preceding period contained 17 active prime contractors and 29 awards.
Reported funding office
NASA SHARED SERVICES CENTER
#9Rank unchangedLatest 12 months
$6.3M
0.99% of positive obligations
Versus preceding 12 months
+$694K
53 active prime contractors · 62 awards
View office comparison and evidence
Reported obligations increased 12.3% from $5.6M to $6.3M. The office’s share of positive obligations moved from 0.76% to 0.99%, a change of +0.2 percentage points.
The latest period contains 86 actions across 62 awards and 35 newly active prime contractors. The preceding period contained 49 active prime contractors and 64 awards.
Reported funding office
NASA LANGLEY RESEARCH CENTER
#10Down 2 from #8Latest 12 months
$4.4M
0.68% of positive obligations
Versus preceding 12 months
−$5.5M
7 active prime contractors · 9 awards
View office comparison and evidence
Reported obligations decreased 55.9% from $9.9M to $4.4M. The office’s share of positive obligations moved from 1.3% to 0.68%, a change of −0.7 percentage points.
The latest period contains 45 actions across 9 awards and 2 newly active prime contractors. The preceding period contained 10 active prime contractors and 28 awards.
Reported funding office
NASA ARMSTRONG FLIGHT RESEARCH CNTR
#12Rank unchangedLatest 12 months
$55K
0.010% of positive obligations
Versus preceding 12 months
+$24K
1 active prime contractor · 2 awards
View office comparison and evidence
Reported obligations increased 78.5% from $31K to $55K. The office’s share of positive obligations moved from 0% to 0.010%, a change of 0.0 percentage points.
The latest period contains 2 actions across 2 awards. The preceding period contained 1 active prime contractor and 1 award.
Contract types, competition, and procurement methods
From Oct 24, 2025 through Oct 23, 2026, 347 awards had positive obligations totaling $654.1M. Np was the leading reported procedure, accounting for 61.8% of positive obligations. Awards with a reported parent IDV accounted for 37.0%. Reported awards used contract vehicles such as SERAE, ESPC Gen4, and OASIS SB.
- Leading award type
- 61.9%
- Definitive Contract
- Leading reported procedure
- 61.8%
- Np
- Reported parent IDV
- 37.0%
- of positive obligations had a reported parent IDV
- Median reported offers
- 1
- 224 of 347 awards reported offers
Observed contract vehicles
Only exact reported parent-PIID matches are shown; missing parent IDs are not inferred.
Buying method changes
Compared with Oct 24, 2024–Oct 23, 2025. Based on 347 current awards and 353 preceding awards with positive net obligations.
- Reported full-and-open obligation share
- 7.7%
- Down from 63.0% in the preceding period
How to read these changes
Directional color and the Up or Down labels show historical movement only. Green does not mean favorable and red does not mean unfavorable; neither predicts a future procurement method.
Same-NAICS comparison
Compared with the NAICS 541330 peer median, parent-IDV obligation share is 50.2 percentage points lower, reported full-and-open obligation share is 12.4 percentage points lower, delivery-order obligation share is 51.5 percentage points lower, and median positive award obligations are 19.0% lower.
| Measure | This market | Peer median | Difference |
|---|---|---|---|
| Parent-IDV obligation share | 37.0% | 87.2% | -50.2 pts |
| Reported full-and-open obligation share | 7.7% | 20.1% | -12.4 pts |
| Delivery-order obligation share | 21.8% | 73.3% | -51.5 pts |
| Median positive award obligations | $243K | $300K | -19.0% |
Peer cohort and comparison limits
The peer median gives each of the 15 eligible agency markets equal weight. The included agency markets are:
- Department of Agriculture (USDA)
- Department of Commerce (COMMERCE)
- Department of Defense (DOD)
- Department of Energy (DOE)
- Department of Health and Human Services (HHS)
- Department of Homeland Security (DHS)
- Department of Justice (DOJ)
- Department of State (STATE)
- Department of the Interior (INTERIOR)
- Department of the Treasury (TREASURY)
- Department of Transportation (TRANSPORTATION)
- Department of Veterans Affairs (VA)
- Environmental Protection Agency (EPA)
- General Services Administration (GSA)
- United States Agency for International Development (USAID)
Agency mission, scale, and acquisition context can differ. Peer position does not establish market attractiveness or predict a future procurement method.
View buying-method details and data coverage
Award types
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Definitive Contract(D) | 28 | $405.1M | 61.9% |
| Delivery Order(C) | 185 | $142.6M | 21.8% |
| BPA Call(A) | 82 | $99.3M | 15.2% |
| Purchase Order(B) | 52 | $7.0M | 1.1% |
Reported parent-award types
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| IDC(B) | 183 | $135.0M | 20.6% |
| BPA(E) | 82 | $99.3M | 15.2% |
| FSS(C) | 2 | $7.6M | 1.2% |
| Not reported | 80 | $412.2M | 63.0% |
Single- or multiple-award parent structure
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Single Award(S) | 193 | $163.5M | 25.0% |
| Multiple Award(M) | 74 | $78.4M | 12.0% |
| Not reported | 80 | $412.2M | 63.0% |
Solicitation procedures
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Np(NEGOTIATED PROPOSAL/QUOTE) | 37 | $404.5M | 61.8% |
| Mafo(SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY) | 48 | $76.0M | 11.6% |
| Sp1(SIMPLIFIED ACQUISITION) | 62 | $39.5M | 6.0% |
| Sss(ONLY ONE SOURCE) | 23 | $36.1M | 5.5% |
| Subject to Multiple Award Fair Opportunity(MAFO) | 30 | $34.4M | 5.3% |
| Negotiated Proposal/Quote(NP) | 23 | $26.1M | 4.0% |
| Other reported values | 124 | $37.5M | 5.7% |
Extent competed
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| A(FULL AND OPEN COMPETITION) | 68 | $396.5M | 60.6% |
| D(FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES) | 48 | $88.2M | 13.5% |
| Full and Open Competition(A) | 39 | $50.3M | 7.7% |
| C(NOT COMPETED) | 19 | $34.9M | 5.3% |
| G(NOT COMPETED UNDER SAP) | 39 | $32.7M | 5.0% |
| Not Competed Under SAP(G) | 52 | $24.5M | 3.8% |
| Other reported values | 82 | $27.0M | 4.1% |
Fair-opportunity and limited-source reporting
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Competitive Set Aside(CSA) | 5 | $50.7M | 7.8% |
| Fair Opportunity Given(FAIR) | 53 | $42.1M | 6.4% |
| Follow-on Action Following Competitive Initial Action(FOO) | 15 | $9.9M | 1.5% |
| Only One Source - Other(ONE) | 5 | $7.8M | 1.2% |
| Not reported | 269 | $543.6M | 83.1% |
Other-than-full-and-open reasons
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| SAP Non-Competition (FAR 13)(SP2) | 91 | $57.2M | 8.8% |
| Only One Source-Other (FAR 6.302-1 Other)(ONE) | 24 | $36.7M | 5.6% |
| National Security (FAR 6.302-6)(NS) | 5 | $2.3M | 0.35% |
| Authorized by Statute (FAR 6.302-5(A)(2)(I))(OTH) | 4 | $1.1M | 0.17% |
| Mobilization, Essential R&d (FAR 6.302-3)(MES) | 1 | $1 | 0% |
| Not reported | 222 | $556.7M | 85.1% |
Contract pricing types
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| R(COST PLUS AWARD FEE) | 5 | $252.7M | 38.6% |
| U(COST PLUS FIXED FEE) | 27 | $160.1M | 24.5% |
| J(FIRM FIXED PRICE) | 168 | $140.1M | 21.4% |
| Firm Fixed Price(J) | 127 | $61.5M | 9.4% |
| Cost Plus Fixed Fee(U) | 17 | $24.9M | 3.8% |
| B(FIXED PRICE LEVEL OF EFFORT) | 1 | $7.4M | 1.1% |
| Other reported values | 2 | $7.3M | 1.1% |
Product or Service Codes
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Support- Professional: Other(R499) | 15 | $168.3M | 25.7% |
| Support- Professional: Engineering/Technical(R425) | 48 | $150.4M | 23.0% |
| Special Studies/Analysis- Other(B599) | 60 | $62.9M | 9.6% |
| Space R&d Services; Space Flight, Research and Supporting Activities; Basic Research(AR11) | 7 | $56.0M | 8.6% |
| R&d- General Science/Technology: Engineering (Management/Support)(AJ46) | 1 | $38.1M | 5.8% |
| Operation of Government-Owned Contractor-Operated (Goco) R&d Facilities(M1HA) | 2 | $31.9M | 4.9% |
| Other reported values | 214 | $146.4M | 22.4% |
Awarding subagencies
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| National Aeronautics and Space Administration(8000) | 345 | $653.0M | 99.8% |
| Public Buildings Service(4740) | 2 | $1.1M | 0.16% |
Awarding offices
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| NASA Goddard Space Flight Center(80GSFC) | 28 | $336.0M | 51.4% |
| NASA Johnson Space Center(80JSC0) | 84 | $110.5M | 16.9% |
| NASA Kennedy Space Center(80KSC0) | 37 | $79.8M | 12.2% |
| NASA Marshall Space Flight Center(80MSFC) | 84 | $49.8M | 7.6% |
| NASA Headquarters(80HQTR) | 20 | $22.5M | 3.4% |
| NASA IT Procurement Office(80TECH) | 2 | $19.4M | 3.0% |
| Other reported values | 92 | $36.1M | 5.5% |
Reported parent IDVs
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| 80JSC023AA001(8000) | 49 | $52.2M | 8.0% |
| 80KSC020D0008(8000) | 8 | $26.8M | 4.1% |
| 80HQTR21D0003(8000) | 20 | $22.5M | 3.4% |
| 80KSC025A0010(8000) | 2 | $18.8M | 2.9% |
| 47QRAD20D8115(4732) | 1 | $18.7M | 2.9% |
| 80MSFC25A0001(8000) | 2 | $13.2M | 2.0% |
| 47QRAA18D00FQ(4732) | 1 | $7.3M | 1.1% |
| DEAM3609GO29030(8900) | 1 | $7.0M | 1.1% |
| Other reported values | 183 | $75.4M | 11.5% |
| Not reported | 80 | $412.2M | 63.0% |
Exact vehicle-match evidence
- SERAE
31 awards · 8 matched parent PIIDs
Evidence: 80KSC022DA114, 80KSC022DA115, 80KSC022DA116, 80KSC022DA117, 80KSC022DA119, …
$18.2M · 2.8%
$1.8M · 0.28%
$1.4M · 0.21%
Reported award data linked 34 awards to a specific catalog vehicle.
Offers, award size, and timing
- Median reported offers
- 1 median
- 224 reported · 123 not reported
- Positive award obligations
- $243K median
- $46K–$871K middle 50%
- Reported performance period
- 364 days (~12 months) median
- 345 reported · 2 not reported
Calculations group latest-period actions by award, retain awards with positive net obligations for share denominators, and use each award's latest reported USAspending procurement fields as of Oct 23, 2026. Blank competition, pricing, PSC, or parent-IDV values remain not reported; they are not inferred. Offer counts must be positive and below the FPDS 999 placeholder. Awarding organizations can differ from the funding agency that defines this page.
Top federal contractors
Latest 12-month market share, concentration, and complete prime contractor rankings across the period shown.
- Prime contractor concentration
- 14 of 106prime contractors account for at least 80% of positive obligations in the last 12 months
- Largest prime contractor
- 20.5%of positive obligations in the last 12 months
- Leading four prime contractors
- 50.0%of positive obligations in the last 12 months
- Leading eight prime contractors
- 65.9%of positive obligations in the last 12 months
Based on $641.9M in positive obligations during the 12 months ending Oct 23, 2026. Individual shares and movement appear in the searchable rankings below. Movement compares with Oct 24, 2024–Oct 23, 2025.
Last 12mo obligation volume: Highest positive obligations first; net deobligations follow by magnitude; contractors with no activity in the last 12 months follow by all-period obligations. Ranks use the complete contractor list and remain fixed when search narrows the results.
- #1
Last 12mo obligations
$131.9M
20.5%
Dollar movement
−$23.3M
vs. prior 12 months
Last 12mo awards
1 award
28 actions
Historical and award details for KBR WYLE SERVICES, LLC
- Obligations: prior → latest
- $155.2M → $131.9M
- −15.0%
- Share: prior → latest
- 20.7% → 20.5%
- −0.1 percentage points
- All-period obligations
- $668.6M
- 18.5% of all-period positive obligations · 4 awards
- Recorded activity
- Since Mar 16, 2022
- through Oct 16, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 1 1 Not reported 0 0 Reported small business 0 0 All-period set-aside types
- 1 · 8(a) sole source
- 1 · 8(a) competed
- #2
Last 12mo obligations
$100.0M
15.6%
Dollar movement
−$29.4M
vs. prior 12 months
Last 12mo awards
5 awards
54 actions
Historical and award details for PERATON INC.
- Obligations: prior → latest
- $129.4M → $100.0M
- −22.7%
- Share: prior → latest
- 17.3% → 15.6%
- −1.7 percentage points
- All-period obligations
- $636.5M
- 17.6% of all-period positive obligations · 9 awards
- Recorded activity
- Since Apr 5, 2022
- through Oct 6, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 5 5 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #3
Last 12mo obligations
$50.7M
7.9%
Dollar movement
−$7.2M
vs. prior 12 months
Last 12mo awards
51 awards
93 actions
Historical and award details for BOOZ ALLEN HAMILTON INC
- Obligations: prior → latest
- $57.8M → $50.7M
- −12.4%
- Share: prior → latest
- 7.7% → 7.9%
- +0.2 percentage points
- All-period obligations
- $228.5M
- 6.3% of all-period positive obligations · 205 awards
- Recorded activity
- Since Dec 4, 2021
- through Oct 21, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 51 68 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #4
Last 12mo obligations
$38.1M
5.9%
Dollar movement
+$10.1M
vs. prior 12 months
Last 12mo awards
1 award
15 actions
Historical and award details for OPR LLC
- Obligations: prior → latest
- $28.0M → $38.1M
- +36.1%
- Share: prior → latest
- 3.7% → 5.9%
- +2.2 percentage points
- All-period obligations
- $163.9M
- 4.5% of all-period positive obligations · 1 award
- Recorded activity
- Since Oct 13, 2021
- through Oct 19, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 1 1 Reported no set-aside 0 0 Not reported 0 0 Reported small business 1 1 All-period set-aside types
- 1 · Total small business
- #5
Last 12mo obligations
$33.8M
5.3%
Dollar movement
−$15.6M
vs. prior 12 months
Last 12mo awards
1 award
32 actions
Historical and award details for LEIDOS, INC.
- Obligations: prior → latest
- $49.4M → $33.8M
- −31.6%
- Share: prior → latest
- 6.6% → 5.3%
- −1.3 percentage points
- All-period obligations
- $93.4M
- 2.6% of all-period positive obligations · 1 award
- Recorded activity
- Since Jun 27, 2024
- through Sep 8, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 1 1 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #6
Last 12mo obligations
$25.9M
4.0%
Dollar movement
+$5.4M
vs. prior 12 months
Last 12mo awards
1 award
10 actions
Historical and award details for LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC
- Obligations: prior → latest
- $20.5M → $25.9M
- +26.3%
- Share: prior → latest
- 2.7% → 4.0%
- +1.3 percentage points
- All-period obligations
- $117.5M
- 3.2% of all-period positive obligations · 1 award
- Recorded activity
- Since Oct 11, 2021
- through Sep 23, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 1 1 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #7
Last 12mo obligations
$22.4M
3.5%
Dollar movement
−$2.9M
vs. prior 12 months
Last 12mo awards
24 awards
41 actions
Historical and award details for AGILE DECISION SCIENCES, LLC
- Obligations: prior → latest
- $25.3M → $22.4M
- −11.6%
- Share: prior → latest
- 3.4% → 3.5%
- +0.1 percentage points
- All-period obligations
- $100.7M
- 2.8% of all-period positive obligations · 40 awards
- Recorded activity
- Since Nov 1, 2021
- through Oct 8, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 24 27 Reported small business 24 27 All-period set-aside types
None reported.
- #8
Last 12mo obligations
$20.0M
3.1%
Dollar movement
−$8.0M
vs. prior 12 months
Last 12mo awards
19 awards
54 actions
Historical and award details for AMENTUM SERVICES, INC.
- Obligations: prior → latest
- $28.0M → $20.0M
- −28.6%
- Share: prior → latest
- 3.7% → 3.1%
- −0.6 percentage points
- All-period obligations
- $106.1M
- 2.9% of all-period positive obligations · 51 awards
- Recorded activity
- Since Nov 9, 2021
- through Oct 21, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 19 26 Reported small business 0 0 All-period set-aside types
None reported.
- #9
Last 12mo obligations
$18.8M
2.9%
Dollar movement
+$13.9M
vs. prior 12 months
Last 12mo awards
2 awards
10 actions
Historical and award details for TESLA LABORATORIES INC.
- Obligations: prior → latest
- $4.9M → $18.8M
- +286.0%
- Share: prior → latest
- 0.65% → 2.9%
- +2.3 percentage points
- All-period obligations
- $31.7M
- 0.87% of all-period positive obligations · 11 awards
- Recorded activity
- Since Oct 14, 2021
- through Sep 28, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 1 Reported no set-aside 0 1 Not reported 2 2 Reported small business 2 4 All-period set-aside types
- 1 · SDVOSB set-aside
- #10
Last 12mo obligations
$18.7M
2.9%
Dollar movement
−$15.5M
vs. prior 12 months
Last 12mo awards
1 award
7 actions
Historical and award details for HALVIK LLC
- Obligations: prior → latest
- $34.3M → $18.7M
- −45.3%
- Share: prior → latest
- 4.6% → 2.9%
- −1.6 percentage points
- All-period obligations
- $133.0M
- 3.7% of all-period positive obligations · 1 award
- Recorded activity
- Since Nov 9, 2021
- through Sep 25, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 1 1 Reported no set-aside 0 0 Not reported 0 0 Reported small business 1 1 All-period set-aside types
- 1 · 8(a) competed
- #11
Last 12mo obligations
$18.0M
2.8%
Dollar movement
−$8.4M
vs. prior 12 months
Last 12mo awards
6 awards
20 actions
Historical and award details for SOUTHWEST RESEARCH INSTITUTE
- Obligations: prior → latest
- $26.5M → $18.0M
- −31.9%
- Share: prior → latest
- 3.5% → 2.8%
- −0.7 percentage points
- All-period obligations
- $92.2M
- 2.5% of all-period positive obligations · 12 awards
- Recorded activity
- Since Oct 4, 2021
- through Oct 15, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 6 5 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #12
Last 12mo obligations
$16.7M
2.6%
Dollar movement
+$4.0M
vs. prior 12 months
Last 12mo awards
1 award
14 actions
Historical and award details for ARES TECHNICAL SERVICES CORPORATION
- Obligations: prior → latest
- $12.7M → $16.7M
- +31.6%
- Share: prior → latest
- 1.7% → 2.6%
- +0.9 percentage points
- All-period obligations
- $86.5M
- 2.4% of all-period positive obligations · 1 award
- Recorded activity
- Since Oct 7, 2021
- through Oct 15, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 1 1 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #13
Last 12mo obligations
$16.0M
2.5%
Dollar movement
−$662K
vs. prior 12 months
Last 12mo awards
4 awards
33 actions
Historical and award details for VICTORY SOLUTIONS, LLC
- Obligations: prior → latest
- $16.7M → $16.0M
- −4.0%
- Share: prior → latest
- 2.2% → 2.5%
- +0.3 percentage points
- All-period obligations
- $85.1M
- 2.4% of all-period positive obligations · 5 awards
- Recorded activity
- Since Oct 18, 2021
- through Sep 28, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 4 2 Reported small business 4 2 All-period set-aside types
None reported.
- #14
Last 12mo obligations
$11.3M
1.8%
Dollar movement
−$18.8M
vs. prior 12 months
Last 12mo awards
1 award
7 actions
Historical and award details for SCIENCE APPLICATIONS INTERNATIONAL CORPORATION
- Obligations: prior → latest
- $30.1M → $11.3M
- −62.5%
- Share: prior → latest
- 4.0% → 1.8%
- −2.3 percentage points
- All-period obligations
- $132.9M
- 3.7% of all-period positive obligations · 3 awards
- Recorded activity
- Since Oct 12, 2021
- through Sep 24, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 1 1 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #15
Last 12mo obligations
$11.2M
1.7%
Dollar movement
−$6.0M
vs. prior 12 months
Last 12mo awards
1 award
9 actions
Historical and award details for HONEYBEE ROBOTICS LLC
- Obligations: prior → latest
- $17.2M → $11.2M
- −35.0%
- Share: prior → latest
- 2.3% → 1.7%
- −0.6 percentage points
- All-period obligations
- $42.0M
- 1.2% of all-period positive obligations · 1 award
- Recorded activity
- Since Feb 23, 2024
- through Aug 7, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 1 1 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
Potential federal contract recompetes
Investigate potential recompetes surfaced by near-term end dates, award value, and recent contract changes.
HALVIK LLC
NASA SITSS-THE SCOPE OF SERVICES SUPPORTS SEWP: BUSINESS SUPPORT, PROGRAM LEVEL SUPPORT, CUSTOMER SUPPORT, CONTRACT HOLDER RELATIONSHIP MANAGEMENT, PROCUREMENT/ ACQUISITION, AND TECHNICAL SUPPORT.
$133.0M is obligated on an award with a reported potential end date of November 30, 2026.
Performance period
97.9%
Current award value as a share of potential value
100.0%
Supporting data
Reported performance starts Dec 1, 2021.
No later potential end date is reported; current and potential end dates are both Nov 30, 2026.
$133.0M is obligated against $148.8M in current reported award value (89.4%).
Obligations are compared with current reported award value, not treated as a contract ceiling.
KBR WYLE SERVICES, LLC
GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)
$681.6M is obligated on an award with a reported potential end date of May 31, 2027.
Performance period
87.9%
Current award value as a share of potential value
100.0%
Supporting data
Reported performance starts Jun 1, 2022.
No later potential end date is reported; current and potential end dates are both May 31, 2027.
$681.6M is obligated against $768.0M in current reported award value (88.8%).
Obligations are compared with current reported award value, not treated as a contract ceiling.
LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC
EXECUTIVE ORDER (E.O.) 14398 TITLED "ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS. THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.
The reported potential end date moved later 3 times in the latest 12 months.
Performance period
94.2%
Current award value as a share of potential value
100.0%
Supporting data
Reported performance starts Jul 1, 2011.
No later potential end date is reported; current and potential end dates are both Sep 30, 2027.
$371.5M is obligated against $394.2M in current reported award value (94.2%).
Reported potential end dates: Oct 31, 2021 → Nov 19, 2021 → Jan 10, 2022 → Jun 30, 2026 → Aug 14, 2026 → Aug 28, 2026 → Sep 30, 2027.
Obligations are compared with current reported award value, not treated as a contract ceiling.
OPR LLC
FLIGHT DYNAMICS SUPPORT SERVICES III (FDSS). THIS CONTRACT IS FOR, BUT NOT LIMITED TO SOFTWARE ENGINEERING SUPPORT, FLIGHT DYNAMICS FACILITY OPERATIONS SUPPORT, FLIGHT DYNAMICS SYSTEMS ENGINEERING.
$223.5M is obligated on an award with a reported potential end date of April 30, 2027.
Performance period
93.1%
Current award value as a share of potential value
100.0%
Supporting data
Reported performance starts Nov 1, 2019.
No later potential end date is reported; current and potential end dates are both Apr 30, 2027.
$223.5M is obligated against $234.5M in current reported award value (95.3%).
Reported potential end dates: Oct 31, 2024 → Oct 31, 2023 → Oct 31, 2024 → Apr 30, 2025 → Oct 30, 2025 → Apr 30, 2027.
Obligations are compared with current reported award value, not treated as a contract ceiling.
ARES TECHNICAL SERVICES CORPORATION
KLXS III
$122.3M is obligated on an award with a reported potential end date of September 30, 2027.
Performance period
88.3%
Current award value as a share of potential value
86.2%
Supporting data
Reported performance starts Oct 1, 2019.
No later potential end date is reported; current and potential end dates are both Sep 30, 2027.
$122.3M is obligated against $144.8M in current reported award value (84.5%).
Reported potential end dates: Sep 30, 2024 → Sep 30, 2027 → Sep 30, 2024 → Sep 30, 2027 → Sep 30, 2024 → Sep 30, 2027 → Sep 30, 2024 → Sep 30, 2027.
Obligations are compared with current reported award value, not treated as a contract ceiling.
SOUTHWEST RESEARCH INSTITUTE
THIS MOD ADDS FUNDING TO SUPPORT PERFORMANCE OF PHASE E/F WORK.
$143.6M is obligated on an award with a reported potential end date of December 2, 2027.
Performance period
88.9%
Current award value as a share of potential value
100.0%
Supporting data
Reported performance starts Nov 22, 2017.
No later potential end date is reported; current and potential end dates are both Dec 2, 2027.
$143.6M is obligated against $144.4M in current reported award value (99.4%).
Reported potential end dates: Feb 2, 2024 → Jul 31, 2025 → Aug 31, 2025 → Dec 2, 2027.
Obligations are compared with current reported award value, not treated as a contract ceiling.
These are research leads, not confirmed recompetes. USAspending records through Oct 23, 2026; reported dates and values can change through later modifications.
Recent federal contract award activity
Recent contract actions with unusually large obligation changes or meaningful shifts in contractor and funding-office activity.
This action
−$18.7M
HALVIK, LLC
NASA IT PROCUREMENT OFFICE
NASA SITSS-THE SCOPE OF SERVICES SUPPORTS SEWP: BUSINESS SUPPORT, PROGRAM LEVEL SUPPORT, CUSTOMER SUPPORT, CONTRACT HOLDER RELATIONSHIP MANAGEMENT, PROCUREMENT/ ACQUISITION, AND TECHNICAL SUPPORT.
Why it stands out
This award recorded a material contraction.
The action removed $18.7M. A deobligation does not by itself show lower requirement demand.
- Award net obligations
- $133.0M
- Share of 12-month positive obligations
- 2.9%
Supporting data
- Prime contractor
- #10 · 2.9% share
- down 5 ranks · −1.6 percentage points · $15.5M net decline; action exceeded it by $3.2M
- Funding office
- #6 · 3.0% attributed share
- down 1 rank · −1.6 percentage points · $14.8M net decline; action exceeded it by $3.9M
This action
+$11.4M
TESLA LABORATORIES INC.
NASA KENNEDY SPACE CENTER
PROVIDE ENGINEERING SUPPORT TO SPECIAL PROJECTS
Why it stands out
The contractor climbed 14 positions in this market.
It now ranks #9 by positive obligations over the latest 12 months.
- Award net obligations
- $14.1M
- Share of 12-month positive obligations
- 1.8%
Supporting data
- Prime contractor
- #9 · 2.9% share
- up 14 ranks · +2.3 percentage points · $13.9M net increase; action accounted for 82.0%
- Funding office
- #3 · 11.0% attributed share
- +2.7 percentage points · $9.1M net increase; action exceeded it by $2.3M
This action
+$23.8M
KBR WYLE SERVICES, LLC
NASA GODDARD SPACE FLIGHT CENTER
GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3) MOD 101 INC FUND
Why it stands out
This award grew while spending attributed to its office declined.
The modification added $23.8M while office-attributed obligations fell $72.2M overall.
- Award net obligations
- $681.6M
- Share of 12-month positive obligations
- 3.7%
Supporting data
- Prime contractor
- #1 · 20.5% share
- $23.3M net decline despite this positive action
- Funding office
- #1 · 52.4% attributed share
- $72.2M net decline despite this positive action
This action
+$21.2M
PERATON INC.
NASA GODDARD SPACE FLIGHT CENTER
THE CONTRACTOR SHALL DESIGN, FABRICATE, INTEGRATE, & PERFORM FLIGHT QUALIFICATION TESTING OF SUB-ORBITAL PAYLOADS, PROVIDE LAUNCH VEHICLES & ASSOCIATED HARDWARE, & PROVIDE VARIOUS ACTIVITIES TO CONDUCT A HOST OF SCIENTIFIC MISSIONS.
Why it stands out
This award grew while spending attributed to its office declined.
The modification added $21.2M while office-attributed obligations fell $72.2M overall.
- Award net obligations
- $190.2M
- Share of 12-month positive obligations
- 3.3%
Supporting data
- Prime contractor
- #2 · 15.6% share
- $29.4M net decline despite this positive action
- Funding office
- #1 · 52.4% attributed share
- $72.2M net decline despite this positive action
This action
+$4.3M
OPR LLC
NASA GODDARD SPACE FLIGHT CENTER
FLIGHT DYNAMICS SUPPORT SERVICES III (FDSS). THIS CONTRACT IS FOR, BUT NOT LIMITED TO SOFTWARE ENGINEERING SUPPORT, FLIGHT DYNAMICS FACILITY OPERATIONS SUPPORT, FLIGHT DYNAMICS SYSTEMS ENGINEERING SUPPORT & CONJUNCTION ASSESSMENTS.
Why it stands out
This award grew while spending attributed to its office declined.
The modification added $4.3M while office-attributed obligations fell $72.2M overall.
- Award net obligations
- $223.5M
- Share of 12-month positive obligations
- 0.67%
Supporting data
- Prime contractor
- #4 · 5.9% share
- up 4 ranks · +2.2 percentage points · $10.1M net increase; action accounted for 42.3%
- Funding office
- #1 · 52.4% attributed share
- $72.2M net decline despite this positive action
This action
+$4.6M
JACOBS ENGINEERING GROUP INC.
NASA MARSHALL SPACE FLIGHT CENTER
MSFC RECAPITALIZATION OF BUILDING SYSTEMS AND CONSOLIDATION
Why it stands out
The contractor climbed 21 positions in this market.
It now ranks #16 by positive obligations over the latest 12 months.
- Award net obligations
- $4.6M
- Share of 12-month positive obligations
- 0.72%
Supporting data
- Prime contractor
- #16 · 1.4% share
- up 21 ranks · +1.2 percentage points · $7.4M net increase; action accounted for 62.2%
- Funding office
- #4 · 7.6% attributed share
- +2.3 percentage points · $9.7M net increase; action accounted for 47.9%
View recent award activity by date (10)
- Action+$119KAward net obligations$838K
- Action+$65KAward net obligations$65K
- Action+$58KAward net obligations$397K
- Action+$266KAward net obligations$266K
- Action−$34KAward net obligations$30.6M
- Action+$1.8MAward net obligations$1.8M
- Action+$660KAward net obligations$660K
- Action+$1.4MAward net obligations$223.5M
- Action+$96KAward net obligations$773K
- Action+$39KAward net obligations$502K
NASA engineering market FAQs
Answers based on reported federal contract data.
Who are the top NASA engineering contractors?
In the 12 months through October 23, 2026, KBR WYLE SERVICES, LLC, PERATON INC., and BOOZ ALLEN HAMILTON INC were the leading NASA engineering prime contractors by positive obligations.
- #1
$131,851,946 in positive obligations
- #2
$100,041,490 in positive obligations
- #3
$50,667,316 in positive obligations
Rankings use reported USAspending award data.
Did NASA contract obligations decrease in the engineering market?
Yes. Measured by net prime contract obligations, reported NASA activity in the engineering market decreased 13.5% from $739,685,017 in the preceding 12 months to $639,490,901 in the 12 months through October 23, 2026.
- Latest 12 months
- $639,490,901
- Net prime contract obligations
- Preceding 12 months
- $739,685,017
- Net prime contract obligations
- Change
- −13.5%
- Between matched 12-month periods
Reported contract actions, not outlays or a forecast.
What recent NASA contract award activity was reported in the engineering market?
Recent NASA contract award activity reported in the engineering market included actions for HALVIK, LLC, TESLA LABORATORIES INC., and KBR WYLE SERVICES, LLC during the 12 months through October 23, 2026.
-
HALVIK, LLC · PIID 80TECH22FA001
Deobligation P00028 · June 8, 2026 · Action obligation: -$18,720,632
-
TESLA LABORATORIES INC. · PIID 80KSC026F0004
Base award · April 20, 2026 · Action obligation: +$11,416,657
-
KBR WYLE SERVICES, LLC · PIID 80GSFC22CA020
Modification P00101 · April 15, 2026 · Action obligation: +$23,806,711
-
PERATON INC. · PIID 80GSFC23CA077
Modification P00043 · September 17, 2026 · Action obligation: +$21,225,034
-
OPR LLC · PIID 80GSFC19C0072
Modification P00116 · April 8, 2026 · Action obligation: +$4,281,513
-
JACOBS ENGINEERING GROUP INC. · PIID 80MSFC26FA041
Base award · September 3, 2026 · Action obligation: +$4,627,375
Action obligations are transaction-level amounts, not current award-level obligations.
Which procurement methods were reported for NASA contracts under NAICS 541330?
From October 24, 2025 through October 23, 2026, NASA reported 347 positive-obligation awards for engineering under NAICS 541330. The leading award type was definitive contract. The leading reported procedure was np.
- Positive-obligation awards
- 347
- Leading reported procedure
- Np
- 61.8% of positive obligations
- Leading award type
- Definitive Contract
- 61.9% of positive obligations
- Full and open
- 7.7%
- of positive obligations
- Reported parent IDV
- 37%
- of positive obligations
Percentages use positive obligations as the denominator.
Which NASA engineering awards may warrant recompete research?
6 NASA engineering awards may warrant recompete research based on reported potential-end dates, including awards held by HALVIK LLC, KBR WYLE SERVICES, LLC, and LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC.
-
HALVIK LLC · PIID 80TECH22FA001
Potential end: November 30, 2026
-
KBR WYLE SERVICES, LLC · PIID 80GSFC22CA020
Potential end: May 31, 2027
-
LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC · PIID NNG11FC20C
Potential end: September 30, 2027
-
OPR LLC · PIID 80GSFC19C0072
Potential end: April 30, 2027
-
ARES TECHNICAL SERVICES CORPORATION · PIID 80KSC019C0016
Potential end: September 30, 2027
-
SOUTHWEST RESEARCH INSTITUTE · PIID 80GSFC18C0014
Potential end: December 2, 2027
Research leads, not confirmed recompetes. Dates may change through later modifications.
Apply this research to a live pursuit
Sweetspot connects opportunity qualification, competitive research, capture, and proposal work in one workspace.
Related market research
Complete market indexes:
Same NAICS at other agencies:
Nearby NAICS at this agency:
Markets sharing leading prime records:
Reported obligations include contract actions from October 1, 2021 through October 23, 2026. Set-aside and business-size fields reflect award records, not a contractor's current eligibility.
Review data methodology