NAICS 238910: Site Preparation Contractors

Explore obligations, trends, recent awards, and incumbent contractors for NAICS 238910.

NAICS 238910 federal market metrics

Total obligations
$5.4B
Total awards
16,543 awards
Active obligations
$176.7M
Size standard
$19,000,000 receipts

What this NAICS covers

NAICS 238910 covers site preparation contracting, including earthmoving, excavation, grading, trenching, demolition, site clearing, erosion control, and installation of temporary stormwater or safety measures necessary to prepare land for construction.

Federal opportunities under 238910 typically involve performing land-works to ready project sites, delivering cleared and graded sites, controlling erosion, removing structures, and coordinating with prime contractors and engineers to meet environmental, safety, and schedule requirements before vertical construction.

FY2025 snapshot

Obligations
$142.2M
Awards
327
Average award
$435K
Change from FY2024
-25.9%

Recent awards

Search contractors

$9,615

SILENT SECURITIES, INC.

US Coast Guard

PIID
70Z03826FM0000021
PSC
N099 - INSTALLATION OF EQUIPMENT- MISCELLANEOUS

$134,325

ACES, LLC

Office of the Secretary

PIID
6913G626P800045
PSC
F999 - OTHER ENVIRONMENTAL SERVICES

$22,500

LAWSON RIDGE, INC.

US Fish and Wildlife Service

PIID
140FS226F0124
PSC
F099 - NATURAL RESOURCES/CONSERVATION- OTHER

FAQ

What work fits NAICS 238910?
  • Clear and grub sites, remove vegetation and non-structural improvements, and prepare building pads for subsequent vertical construction contracts.
  • Perform mass grading, cut-and-fill balancing, and establish rough grades to achieve design drainage patterns and final elevation targets.
  • Excavate and backfill for foundations, footings, and basements to design elevations, coordinate haul-off of unsuitable material, and provide temporary erosion controls.
  • Provide trenching, bedding, and backfill to support later utility installation contracts while marking and protecting existing underground utilities.
When is NAICS 238910 a weak fit?
  • General building construction that includes structural framing, finishes, and commissioning, because site preparation lacks responsibility for vertical construction and building trades.
  • Utility installation contracts that include laying pipe or conduit, system connection, testing, and commissioning, since site preparation stops before system installation and operational testing.
  • Environmental remediation projects that require hazardous waste characterization, regulated disposal, and remediation design, because site preparation excludes remediation oversight and handling of regulated wastes.
What solicitation language points to NAICS 238910?
  • Line items specify topsoil stripping areas and depths, erosion and sediment control measures, cut-and-fill quantities, and haul-off and disposal instructions.
  • Contract requires compaction testing criteria, elevation tolerances for rough and finish grades, utility locating and protection procedures, and sequencing to support follow-on trades.
  • Scope expressly excludes installation of permanent utilities and structures, defines demolition limits, and requires restoration of adjacent areas after clearing and grading.