Top NASA commercial and institutional building construction contractors (NAICS 236220)
- Latest 12 months
- $181.4M
- Net obligations · Up $113.8M vs. $67.6M preceding
- Prime contractors
- 54
- With positive obligations in the latest 12 months
Research the NASA federal contracting market for commercial and institutional building construction under NAICS 236220. Compare top federal contractors and market share, reported contract obligations and spending trends, funding-office attribution, recent award activity, and contract types, competition, and procurement methods.
Contract obligation trends for Commercial and Institutional Building Construction at the National Aeronautics and Space Administration
Federal records show $578.8M in net obligations across 857 awards in Commercial and Institutional Building Construction at the National Aeronautics and Space Administration from Oct 1, 2021 through Sep 10, 2026. This market accounts for 0.79% of $73.3B in agency-wide net prime contract obligations over the period shown. Latest 12-month net obligations increased 168.4% from $67.6M to $181.4M. 8 prime contractors accounted for at least 80% of positive obligations in that latest period.
Fiscal-year activity
FY26 is year-to-date through Sep 10, 2026; earlier years show complete fiscal-year totals.
View fiscal-year data table
| Fiscal year | Net obligations | Contract actions | Coverage |
|---|---|---|---|
| FY2022 | $138.6M | 775 | Complete |
| FY2023 | $136.4M | 793 | Complete |
| FY2024 | $62.6M | 589 | Complete |
| FY2025 | $77.8M | 474 | Complete |
| FY2026 | $163.3M | 379 | YTD through Sep 10, 2026 |
Market at a glance
All reported prime contract awards- All-period net obligations
- $578.8M
- 857 awards · 99 prime contractors
- Latest 12-month movement
- +168.4%
- $181.4M vs. $67.6M
- Leading eight prime share
- 81.7%
- Share held by the eight leading prime contractors in the latest 12 months
View agency share, denominators, and set-aside reporting
- Agency context
- 0.79% of $73.3B in agency-wide net obligations.
- Set-aside share when reported
- 79.5% of 78 awards with reported set-aside status.
- Set-aside reporting
- 62 set aside · 16 no set-aside · 779 not reported
What changed in the last 12 months?
Sep 11, 2025–Sep 10, 2026, compared with Sep 11, 2024–Sep 10, 2025.
Market structure
Reported set-aside share decreased
Buyer demand
Reported obligations through NASA MARSHALL SPACE FLIGHT CENTER increased
Competitive shifts
MADISON ELECTRIC INC climbed the most in the contractor rankings
ERIE AFFILIATES INC lost the most market share
THRASH COMMERCIAL CONTRACTORS, INC. was the largest newly observed contractor
View 6 additional material changes
Competitive shifts
PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC. had the largest increase in reported obligations
V.I.P. ELECTRIC COMPANY fell the most in the contractor rankings
SEA PAC ENGINEERING INC had the largest decline in reported obligations
Award activity
THRASH COMMERCIAL CONTRACTORS, INC. received an unusually large obligation action
Market structure
Top-five contractor share increased
Buyer demand
Reported obligations through NASA LANGLEY RESEARCH CENTER decreased
How these findings are calculated
Findings are selected from matched-period changes in obligations, share, rank, funding offices, concentration, reported set-asides, material award actions, and agency-peer outliers. Related signals are combined, and only material evidence-backed changes are shown. Review the full methodology.
Federal contract obligations by funding office
See how positive obligations were attributed across funding offices in the 12 months ending Sep 10, 2026.
43.1% of positive obligations were attributed to NASA MARSHALL SPACE FLIGHT CENTER. That represents $78.2M, up $71.1M from the preceding 12 months.
Latest 12-month share of positive obligations; the gray segment represents all other reported offices.
- NASA MARSHALL SPACE FLIGHT CENTER43.1% · $78.2M · up $71.1M
- NASA GLENN RESEARCH CENTER28.9% · $52.4M · up $25.9M
- NASA KENNEDY SPACE CENTER13.5% · $24.4M · up $8.2M
- NASA ARMSTRONG FLIGHT RESEARCH CNTR7.8% · $14.1M · up $3.0M
- NASA AMES RESEARCH CENTER6.4% · $11.6M · up $6.1M
- All other reported offices0.36% of positive obligations
View reported office rankings, comparisons, and evidence
USAspending assigns each award to a funding office. That office may differ from the requiring activity, program office, contracting office, individual buyer, or actual customer.
Reported funding office
NASA MARSHALL SPACE FLIGHT CENTER
#1Up 3 from #4Latest 12 months
$78.2M
43.1% of positive obligations
Versus preceding 12 months
+$71.1M
11 active prime contractors · 43 awards
View office comparison and evidence
Reported obligations increased 1001.2% from $7.1M to $78.2M. The office’s share of positive obligations moved from 10.5% to 43.1%, a change of +32.7 percentage points.
The latest period contains 53 actions across 43 awards and 3 newly active prime contractors. The preceding period contained 10 active prime contractors and 77 awards.
Leading award-level changes
- THRASH COMMERCIAL CONTRACTORS, INC. · PIID 80MSFC26C0016+$62.3M: $0 → $62.3M
- APACHE ELECTRICAL CONTRACTORS INC · PIID 80MSFC26FA035+$6.0M: $0 → $6.0M
Reported funding office
NASA GLENN RESEARCH CENTER
#2Down 1 from #1Latest 12 months
$52.4M
28.9% of positive obligations
Versus preceding 12 months
+$25.9M
5 active prime contractors · 64 awards
View office comparison and evidence
Reported obligations increased 97.8% from $26.5M to $52.4M. The office’s share of positive obligations moved from 39.0% to 28.9%, a change of −10.2 percentage points.
The latest period contains 165 actions across 64 awards. The preceding period contained 6 active prime contractors and 61 awards.
Reported funding office
NASA KENNEDY SPACE CENTER
#3Down 1 from #2Latest 12 months
$24.4M
13.5% of positive obligations
Versus preceding 12 months
+$8.2M
5 active prime contractors · 43 awards
View office comparison and evidence
Reported obligations increased 50.3% from $16.3M to $24.4M. The office’s share of positive obligations moved from 24.0% to 13.5%, a change of −10.5 percentage points.
The latest period contains 68 actions across 43 awards and 2 newly active prime contractors. The preceding period contained 4 active prime contractors and 50 awards.
Reported funding office
NASA ARMSTRONG FLIGHT RESEARCH CNTR
#4Down 1 from #3Latest 12 months
$14.1M
7.8% of positive obligations
Versus preceding 12 months
+$3.0M
30 active prime contractors · 41 awards
View office comparison and evidence
Reported obligations increased 26.8% from $11.1M to $14.1M. The office’s share of positive obligations moved from 16.4% to 7.8%, a change of −8.6 percentage points.
The latest period contains 58 actions across 41 awards and 25 newly active prime contractors. The preceding period contained 6 active prime contractors and 14 awards.
Reported funding office
NASA AMES RESEARCH CENTER
#5Rank unchangedLatest 12 months
$11.6M
6.4% of positive obligations
Versus preceding 12 months
+$6.1M
7 active prime contractors · 14 awards
View office comparison and evidence
Reported obligations increased 112.9% from $5.4M to $11.6M. The office’s share of positive obligations moved from 8.0% to 6.4%, a change of −1.6 percentage points.
The latest period contains 53 actions across 14 awards and 3 newly active prime contractors. The preceding period contained 5 active prime contractors and 12 awards.
Reported funding office
NASA GODDARD SPACE FLIGHT CENTER
#6New to the positive-obligation rankingLatest 12 months
$409K
0.23% of positive obligations
Versus preceding 12 months
+$707K
2 active prime contractors · 2 awards
View office comparison and evidence
Reported obligations moved from $298K in net deobligations to $409K in net obligations. The office’s share of positive obligations moved from 0% to 0.23%, a change of +0.2 percentage points.
The latest period contains 3 actions across 2 awards. The preceding period contained 5 active prime contractors and 6 awards.
Reported funding office
NASA LANGLEY RESEARCH CENTER
#7Down 1 from #6Latest 12 months
$243K
0.13% of positive obligations
Versus preceding 12 months
−$1.2M
4 active prime contractors · 4 awards
View office comparison and evidence
Reported obligations decreased 83.3% from $1.5M to $243K. The office’s share of positive obligations moved from 2.1% to 0.13%, a change of −2.0 percentage points.
The latest period contains 18 actions across 4 awards and 1 newly active prime contractor. The preceding period contained 4 active prime contractors and 5 awards.
Leading award-level changes
- BL HARBERT INTERNATIONAL LLC · PIID 47PD0321C0004−$884K: $1.1M → $220K
- PIERLESS VENTURES-DVORAK JV, LLC · PIID 47PA0325F0001−$350K: $350K → $0
Contract types, competition, and procurement methods
From Sep 11, 2025 through Sep 10, 2026, 182 awards had positive obligations totaling $181.8M. Ts was the leading reported procedure, accounting for 34.3% of positive obligations. Awards with a reported parent IDV accounted for 64.6%.
- Leading award type
- 64.6%
- Delivery Order
- Leading reported procedure
- 34.3%
- Ts
- Reported parent IDV
- 64.6%
- of positive obligations had a reported parent IDV
- Median reported offers
- 3
- 176 of 182 awards reported offers
Buying method changes
Compared with Sep 11, 2024–Sep 10, 2025. Based on 182 current awards and 188 preceding awards with positive net obligations.
- Leading reported procedure
- Ts
- Previously Subject to Multiple Award Fair Opportunity · 94.2% preceding vs 34.3% current
- Parent-IDV obligation share
- 64.6%
- Down from 95.5% in the preceding period
How to read these changes
Directional color and the Up or Down labels show historical movement only. Green does not mean favorable and red does not mean unfavorable; neither predicts a future procurement method.
Same-NAICS comparison
Compared with the NAICS 236220 peer median, parent-IDV obligation share is 32.1 percentage points higher, reported full-and-open obligation share is 9.5 percentage points lower, delivery-order obligation share is 38.3 percentage points higher, and median positive award obligations are 2.6% higher.
| Measure | This market | Peer median | Difference |
|---|---|---|---|
| Parent-IDV obligation share | 64.6% | 32.5% | +32.1 pts |
| Reported full-and-open obligation share | 0.20% | 9.7% | -9.5 pts |
| Delivery-order obligation share | 64.6% | 26.3% | +38.3 pts |
| Median positive award obligations | $160K | $156K | +2.6% |
Peer cohort and comparison limits
The peer median gives each of the 16 eligible agency markets equal weight. The included agency markets are:
- Department of Agriculture (USDA)
- Department of Commerce (COMMERCE)
- Department of Defense (DOD)
- Department of Energy (DOE)
- Department of Health and Human Services (HHS)
- Department of Homeland Security (DHS)
- Department of Justice (DOJ)
- Department of Labor (LABOR)
- Department of State (STATE)
- Department of the Interior (INTERIOR)
- Department of the Treasury (TREASURY)
- Department of Transportation (TRANSPORTATION)
- Department of Veterans Affairs (VA)
- Environmental Protection Agency (EPA)
- General Services Administration (GSA)
- Social Security Administration (SSA)
Agency mission, scale, and acquisition context can differ. Peer position does not establish market attractiveness or predict a future procurement method.
View buying-method details and data coverage
Award types
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Delivery Order(C) | 172 | $117.5M | 64.6% |
| Definitive Contract(D) | 6 | $63.0M | 34.6% |
| Purchase Order(B) | 4 | $1.3M | 0.73% |
Reported parent-award types
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| IDC(B) | 172 | $117.5M | 64.6% |
| Not reported | 10 | $64.3M | 35.4% |
Single- or multiple-award parent structure
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Multiple Award(M) | 166 | $116.3M | 64.0% |
| Single Award(S) | 6 | $1.2M | 0.65% |
| Not reported | 10 | $64.3M | 35.4% |
Solicitation procedures
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Ts(TWO STEP) | 1 | $62.3M | 34.3% |
| Subject to Multiple Award Fair Opportunity(MAFO) | 118 | $58.3M | 32.0% |
| Mafo(SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY) | 48 | $58.1M | 31.9% |
| Negotiated Proposal/Quote(NP) | 7 | $2.1M | 1.2% |
| Np(NEGOTIATED PROPOSAL/QUOTE) | 3 | $393K | 0.22% |
| Two Step(TS) | 3 | $360K | 0.20% |
| Other reported values | 2 | $299K | 0.16% |
Extent competed
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| A(FULL AND OPEN COMPETITION) | 4 | $62.7M | 34.5% |
| Full and Open Competition After Exclusion of Sources(D) | 125 | $60.4M | 33.2% |
| D(FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES) | 48 | $58.1M | 31.9% |
| Full and Open Competition(A) | 3 | $360K | 0.20% |
| G(NOT COMPETED UNDER SAP) | 1 | $285K | 0.16% |
| Not Competed(C) | 1 | $14K | 0.010% |
Fair-opportunity and limited-source reporting
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Fair Opportunity Given(FAIR) | 123 | $99.7M | 54.8% |
| Competitive Set Aside(CSA) | 12 | $15.3M | 8.4% |
| Follow-on Action Following Competitive Initial Action(FOO) | 5 | $1.3M | 0.72% |
| Minimum Guarantee(MG) | 26 | $26K | 0.010% |
| Not reported | 16 | $65.5M | 36.0% |
Other-than-full-and-open reasons
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Authorized by Statute (FAR 6.302-5(A)(2)(I))(OTH) | 1 | $285K | 0.16% |
| Only One Source-Other (FAR 6.302-1 Other)(ONE) | 1 | $14K | 0.010% |
| Not reported | 180 | $181.5M | 99.8% |
Contract pricing types
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| J(FIRM FIXED PRICE) | 53 | $121.1M | 66.6% |
| Firm Fixed Price(J) | 129 | $60.8M | 33.4% |
Product or Service Codes
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| Construction of Office Buildings(Y1AA) | 3 | $62.5M | 34.4% |
| Construction of Government-Owned Government-Operated (Gogo) R&d Facilities(Y1HB) | 59 | $52.8M | 29.0% |
| Repair or Alteration of Office Buildings(Z2AA) | 42 | $24.2M | 13.3% |
| Construction of Miscellaneous Buildings(Y1JZ) | 26 | $16.0M | 8.8% |
| Repair or Alteration of Other Administrative Facilities and Service Buildings(Z2AZ) | 33 | $13.6M | 7.5% |
| Repair or Alteration of Miscellaneous Buildings(Z2JZ) | 16 | $12.3M | 6.7% |
| Other reported values | 3 | $570K | 0.31% |
Awarding subagencies
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| National Aeronautics and Space Administration(8000) | 179 | $181.5M | 99.8% |
| Public Buildings Service(4740) | 3 | $360K | 0.20% |
Awarding offices
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| NASA Marshall Space Flight Center(80MSFC) | 27 | $78.2M | 43.0% |
| NASA Glenn Research Center(80GRC0) | 59 | $52.8M | 29.0% |
| NASA Kennedy Space Center(80KSC0) | 43 | $24.4M | 13.4% |
| NASA Armstrong Flight Research Cntr(80AFRC) | 40 | $14.2M | 7.8% |
| NASA Ames Research Center(80ARC0) | 8 | $11.4M | 6.3% |
| NASA Goddard Space Flight Center(80GSFC) | 1 | $414K | 0.23% |
| Other reported values | 4 | $383K | 0.21% |
Reported parent IDVs
| Reported value | Awards | Positive obligations | Share |
|---|---|---|---|
| 80GRC020D0009(8000) | 28 | $19.8M | 10.9% |
| 80GRC020D0012(8000) | 8 | $18.8M | 10.3% |
| 80KSC021DA005(8000) | 23 | $12.7M | 7.0% |
| 80GRC020D0013(8000) | 8 | $9.6M | 5.3% |
| 80AFRC26DA004(8000) | 1 | $8.9M | 4.9% |
| 80KSC021DA002(8000) | 11 | $7.3M | 4.0% |
| 80MSFC24DA003(8000) | 1 | $6.0M | 3.3% |
| 80AFRC19D0004(8000) | 3 | $5.6M | 3.1% |
| Other reported values | 89 | $28.8M | 15.9% |
| Not reported | 10 | $64.3M | 35.4% |
Offers, award size, and timing
- Median reported offers
- 3 median
- 176 reported · 6 not reported
- Positive award obligations
- $160K median
- $15K–$557K middle 50%
- Reported performance period
- 268 days (~9 months) median
- 182 reported · 0 not reported
Calculations group latest-period actions by award, retain awards with positive net obligations for share denominators, and use each award's latest reported USAspending procurement fields as of Sep 10, 2026. Blank competition, pricing, PSC, or parent-IDV values remain not reported; they are not inferred. Offer counts must be positive and below the FPDS 999 placeholder. Awarding organizations can differ from the funding agency that defines this page.
Top federal contractors
Latest 12-month market share, concentration, and complete prime contractor rankings across the period shown.
- Prime contractor concentration
- 8 of 54prime contractors account for at least 80% of positive obligations in the last 12 months
- Largest prime contractor
- 34.4%of positive obligations in the last 12 months
- Leading four prime contractors
- 62.6%of positive obligations in the last 12 months
- Leading eight prime contractors
- 81.7%of positive obligations in the last 12 months
Based on $181.5M in positive obligations during the 12 months ending Sep 10, 2026. Individual shares and movement appear in the searchable rankings below. Movement compares with Sep 11, 2024–Sep 10, 2025.
Last 12mo obligation volume: Highest positive obligations first; net deobligations follow by magnitude; contractors with no activity in the last 12 months follow by all-period obligations. Ranks use the complete contractor list and remain fixed when search narrows the results.
- #1
Last 12mo obligations
$62.3M
34.4%
Dollar movement
+$62.3M
vs. prior 12 months
Last 12mo awards
1 award
2 actions
Historical and award details for THRASH COMMERCIAL CONTRACTORS, INC.
- Obligations: prior → latest
- $0 → $62.3M
- Not comparable
- Share: prior → latest
- 0% → 34.4%
- +34.4 percentage points
- All-period obligations
- $62.3M
- 10.8% of all-period positive obligations · 1 award
- Recorded activity
- Since Aug 27, 2026
- through Sep 2, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 1 0 Not reported 0 0 Reported small business 0 0 All-period set-aside types
None reported.
- #2
Last 12mo obligations
$19.8M
10.9%
Dollar movement
+$6.4M
vs. prior 12 months
Last 12mo awards
30 awards
70 actions
Historical and award details for ERIE AFFILIATES INC
- Obligations: prior → latest
- $13.4M → $19.8M
- +47.4%
- Share: prior → latest
- 19.2% → 10.9%
- −8.3 percentage points
- All-period obligations
- $71.3M
- 12.3% of all-period positive obligations · 81 awards
- Recorded activity
- Since Oct 14, 2021
- through Sep 3, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 3 7 Reported no set-aside 0 0 Not reported 27 21 Reported small business 30 28 All-period set-aside types
- 16 · Total small business
- #3
Last 12mo obligations
$18.8M
10.4%
Dollar movement
+$15.1M
vs. prior 12 months
Last 12mo awards
9 awards
25 actions
Historical and award details for PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.
- Obligations: prior → latest
- $3.8M → $18.8M
- +401.3%
- Share: prior → latest
- 5.4% → 10.4%
- +5.0 percentage points
- All-period obligations
- $56.9M
- 9.8% of all-period positive obligations · 36 awards
- Recorded activity
- Since Oct 18, 2021
- through Sep 4, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 1 2 Reported no set-aside 0 0 Not reported 8 9 Reported small business 9 11 All-period set-aside types
- 11 · Total small business
- #4
Last 12mo obligations
$12.7M
7.0%
Dollar movement
+$2.2M
vs. prior 12 months
Last 12mo awards
23 awards
31 actions
Historical and award details for ALEUT CONSTRUCTION LLC
- Obligations: prior → latest
- $10.6M → $12.7M
- +20.6%
- Share: prior → latest
- 15.1% → 7.0%
- −8.1 percentage points
- All-period obligations
- $26.6M
- 4.6% of all-period positive obligations · 49 awards
- Recorded activity
- Since Feb 6, 2023
- through Sep 3, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 2 7 Reported no set-aside 0 0 Not reported 21 16 Reported small business 23 23 All-period set-aside types
- 8 · 8(a) competed
- #5
Last 12mo obligations
$11.2M
6.2%
Dollar movement
+$1.5M
vs. prior 12 months
Last 12mo awards
4 awards
13 actions
Historical and award details for ANNA LISA LUNA CONSTRUCTION, INC.
- Obligations: prior → latest
- $9.7M → $11.2M
- +15.0%
- Share: prior → latest
- 14.0% → 6.2%
- −7.8 percentage points
- All-period obligations
- $22.1M
- 3.8% of all-period positive obligations · 7 awards
- Recorded activity
- Since Nov 30, 2021
- through Aug 31, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 2 2 Reported no set-aside 0 0 Not reported 2 2 Reported small business 4 4 All-period set-aside types
- 3 · Total small business
- 2 · 8(a) competed
- #6
Last 12mo obligations
$9.6M
5.3%
Dollar movement
+$4.6M
vs. prior 12 months
Last 12mo awards
9 awards
19 actions
Historical and award details for R.J. RUNGE COMPANY, INC.
- Obligations: prior → latest
- $5.0M → $9.6M
- +91.7%
- Share: prior → latest
- 7.2% → 5.3%
- −1.9 percentage points
- All-period obligations
- $48.2M
- 8.3% of all-period positive obligations · 30 awards
- Recorded activity
- Since Nov 8, 2021
- through Sep 4, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 9 9 Reported small business 9 9 All-period set-aside types
- 3 · Total small business
- #7
Last 12mo obligations
$7.6M
4.2%
Dollar movement
+$2.1M
vs. prior 12 months
Last 12mo awards
12 awards
27 actions
Historical and award details for WRIGHT BROS LLC
- Obligations: prior → latest
- $5.4M → $7.6M
- +39.2%
- Share: prior → latest
- 7.8% → 4.2%
- −3.6 percentage points
- All-period obligations
- $43.1M
- 7.4% of all-period positive obligations · 43 awards
- Recorded activity
- Since Jan 14, 2022
- through Sep 1, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 2 4 Reported no set-aside 0 0 Not reported 10 15 Reported small business 12 19 All-period set-aside types
- 3 · 8(a) competed
- 1 · 8(a) sole source
- #8
Last 12mo obligations
$6.4M
3.5%
Dollar movement
+$1.1M
vs. prior 12 months
Last 12mo awards
19 awards
54 actions
Historical and award details for PPW BUILDERS INC
- Obligations: prior → latest
- $5.3M → $6.4M
- +20.4%
- Share: prior → latest
- 7.6% → 3.5%
- −4.1 percentage points
- All-period obligations
- $14.5M
- 2.5% of all-period positive obligations · 32 awards
- Recorded activity
- Since Nov 5, 2021
- through Sep 2, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 19 12 Reported small business 19 12 All-period set-aside types
None reported.
- #9
Last 12mo obligations
$6.0M
3.3%
Dollar movement
+$4.6M
vs. prior 12 months
Last 12mo awards
5 awards
6 actions
Historical and award details for APACHE ELECTRICAL CONTRACTORS INC
- Obligations: prior → latest
- $1.4M → $6.0M
- +335.9%
- Share: prior → latest
- 2.0% → 3.3%
- +1.3 percentage points
- All-period obligations
- $10.9M
- 1.9% of all-period positive obligations · 50 awards
- Recorded activity
- Since Oct 21, 2021
- through Jul 29, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 5 10 Reported small business 5 10 All-period set-aside types
None reported.
- #10
Last 12mo obligations
$5.6M
3.1%
Dollar movement
+$5.4M
vs. prior 12 months
Last 12mo awards
4 awards
18 actions
Historical and award details for IRONWOOD COMMERCIAL BUILDERS INC
- Obligations: prior → latest
- $212K → $5.6M
- +2531.7%
- Share: prior → latest
- 0.30% → 3.1%
- +2.8 percentage points
- All-period obligations
- $9.1M
- 1.6% of all-period positive obligations · 6 awards
- Recorded activity
- Since Jan 12, 2022
- through Sep 1, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 4 2 Reported small business 4 2 All-period set-aside types
None reported.
- #11
Last 12mo obligations
$3.6M
2.0%
Dollar movement
+$3.6M
vs. prior 12 months
Last 12mo awards
1 award
1 action
Historical and award details for IPI CONSTRUCTION
- Obligations: prior → latest
- $0 → $3.6M
- Not comparable
- Share: prior → latest
- 0% → 2.0%
- +2.0 percentage points
- All-period obligations
- $3.6M
- 0.62% of all-period positive obligations · 1 award
- Recorded activity
- Since Jun 24, 2026
- through Jun 24, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 1 0 Reported no set-aside 0 0 Not reported 0 0 Reported small business 1 0 All-period set-aside types
- 1 · Total small business
- #12
Last 12mo obligations
$3.0M
1.6%
Dollar movement
−$379K
vs. prior 12 months
Last 12mo awards
7 awards
20 actions
Historical and award details for LEAD BUILDERS INC
- Obligations: prior → latest
- $3.4M → $3.0M
- −11.2%
- Share: prior → latest
- 4.8% → 1.6%
- −3.2 percentage points
- All-period obligations
- $40.9M
- 7.1% of all-period positive obligations · 11 awards
- Recorded activity
- Since Feb 2, 2022
- through Jul 15, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 2 2 Reported no set-aside 0 0 Not reported 5 4 Reported small business 7 6 All-period set-aside types
- 1 · 8(a) competed
- 1 · Total small business
- #13
Last 12mo obligations
$3.0M
1.6%
Dollar movement
+$2.9M
vs. prior 12 months
Last 12mo awards
2 awards
2 actions
Historical and award details for MADISON ELECTRIC INC
- Obligations: prior → latest
- $79K → $3.0M
- +3658.3%
- Share: prior → latest
- 0.11% → 1.6%
- +1.5 percentage points
- All-period obligations
- $4.4M
- 0.75% of all-period positive obligations · 18 awards
- Recorded activity
- Since Nov 8, 2021
- through Jun 24, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 2 5 Reported small business 2 5 All-period set-aside types
None reported.
- #14
Last 12mo obligations
$2.3M
1.3%
Dollar movement
+$1.3M
vs. prior 12 months
Last 12mo awards
4 awards
4 actions
Historical and award details for BACIK GROUP LLC
- Obligations: prior → latest
- $1.0M → $2.3M
- +121.9%
- Share: prior → latest
- 1.5% → 1.3%
- −0.2 percentage points
- All-period obligations
- $6.3M
- 1.1% of all-period positive obligations · 37 awards
- Recorded activity
- Since Nov 8, 2021
- through Sep 2, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 4 18 Reported small business 4 18 All-period set-aside types
None reported.
- #15
Last 12mo obligations
$1.9M
1.0%
Dollar movement
+$1.9M
vs. prior 12 months
Last 12mo awards
3 awards
3 actions
Historical and award details for ALEUT CONSTRUCTION LLC
- Obligations: prior → latest
- $0 → $1.9M
- Not comparable
- Share: prior → latest
- 0% → 1.0%
- +1.0 percentage points
- All-period obligations
- $1.9M
- 0.33% of all-period positive obligations · 3 awards
- Recorded activity
- Since Sep 4, 2026
- through Sep 8, 2026
Award reporting
Latest and prior 12-month award reporting Reported award evidence Latest Prior Reported set-aside 0 0 Reported no set-aside 0 0 Not reported 3 0 Reported small business 3 0 All-period set-aside types
None reported.
Recent federal contract award activity
Recent contract actions with unusually large obligation changes or meaningful shifts in contractor and funding-office activity.
This action
+$62.0M
THRASH COMMERCIAL CONTRACTORS, INC.
NASA MARSHALL SPACE FLIGHT CENTER
DESIGN-BUILD SERVICES FOR THE COMPLETE DESIGN AND CONSTRUCTION FOR THE MARSHALL EXPLORATION FACILITY (MEF)
Why it stands out
One action equaled more than a third of the market’s latest 12-month positive obligations.
The $62.0M action represented 34.2% of the market’s positive obligations over the latest 12 months.
- Award net obligations
- $62.3M
- Share of 12-month positive obligations
- 34.2%
Supporting data
- Prime contractor
- #1 · 34.4% share
- Newly active in this market; no actions were reported in the preceding 12 months
- Funding office
- #1 · 43.1% attributed share
- up 3 ranks · +32.7 percentage points · $71.1M net increase; action accounted for 87.2%
This action
+$7.9M
PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.
NASA GLENN RESEARCH CENTER
PROJECT 33233 ATF CRYOGENIC FACILITY
Why it stands out
The contractor climbed 4 positions in this market.
It now ranks #3 by positive obligations over the latest 12 months.
- Award net obligations
- $9.5M
- Share of 12-month positive obligations
- 4.3%
Supporting data
- Prime contractor
- #3 · 10.4% share
- up 4 ranks · +5.0 percentage points · $15.1M net increase; action accounted for 52.3%
- Funding office
- #2 · 28.9% attributed share
- down 1 rank · −10.2 percentage points · $25.9M net increase; action accounted for 30.4%
This action
+$4.0M
IRONWOOD COMMERCIAL BUILDERS INC
NASA AMES RESEARCH CENTER
N239 CHILLER REPLACEMENT AND 2 COOLING TOWERS
Why it stands out
The contractor climbed 12 positions in this market.
It now ranks #10 by positive obligations over the latest 12 months.
- Award net obligations
- $4.0M
- Share of 12-month positive obligations
- 2.2%
Supporting data
- Prime contractor
- #10 · 3.1% share
- up 12 ranks · +2.8 percentage points · $5.4M net increase; action accounted for 74.0%
- Funding office
- #5 · 6.4% attributed share
- −1.6 percentage points · $6.1M net increase; action accounted for 64.7%
This action
+$6.0M
APACHE ELECTRICAL CONTRACTORS INC
NASA MARSHALL SPACE FLIGHT CENTER
MINOR CONSTRUCTION TASK ORDER
Why it stands out
The contractor climbed 3 positions in this market.
It now ranks #9 by positive obligations over the latest 12 months.
- Award net obligations
- $6.0M
- Share of 12-month positive obligations
- 3.3%
Supporting data
- Prime contractor
- #9 · 3.3% share
- up 3 ranks · +1.3 percentage points · $4.6M net increase; action exceeded it by $1.4M
This action
+$3.6M
IPI CONSTRUCTION
NASA AMES RESEARCH CENTER
WRMACC NOR CAL SEED PROJECT FOR HVAC REMOVAL AND REPLACEMENT N254
Why it stands out
No activity for this contractor was reported in this market during the preceding 12 months.
The base action placed the contractor #11 in this market by positive obligations over the latest 12 months.
- Award net obligations
- $3.6M
- Share of 12-month positive obligations
- 2.0%
Supporting data
- Prime contractor
- #11 · 2.0% share
- Newly active in this market; no actions were reported in the preceding 12 months
This action
+$3.0M
MADISON ELECTRIC INC
NASA MARSHALL SPACE FLIGHT CENTER
MINOR CONSTRUCTION TASK ORDER TO REVITALIZE THE ELECTRICAL SYSTEM IN BUILDING 4583 PER FWR R001108345 IFB PACKAGE.
Why it stands out
The contractor climbed 12 positions in this market.
It now ranks #13 by positive obligations over the latest 12 months.
- Award net obligations
- $3.0M
- Share of 12-month positive obligations
- 1.6%
Supporting data
- Prime contractor
- #13 · 1.6% share
- up 12 ranks · +1.5 percentage points · $2.9M net increase; action exceeded it by $74K
View recent award activity by date (10)
- Action+$27KAward net obligations$27K
- Action+$678KAward net obligations$678K
- Action+$937KAward net obligations$937K
- Action+$280KAward net obligations$280K
- Action+$210KAward net obligations$567K
- Action+$160KAward net obligations$2.0M
- Action+$2.6MAward net obligations$2.6M
- Action+$154KAward net obligations$6.1M
- Action+$36KAward net obligations$281K
- Action+$33KAward net obligations$1.1M
NASA commercial and institutional building construction market FAQs
Answers based on reported federal contract data.
Who are the top NASA commercial and institutional building construction contractors?
In the 12 months through September 10, 2026, THRASH COMMERCIAL CONTRACTORS, INC., ERIE AFFILIATES INC, and PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC. were the leading NASA commercial and institutional building construction prime contractors by positive obligations.
- #1
THRASH COMMERCIAL CONTRACTORS, INC.
$62,338,188 in positive obligations
- #2
$19,760,310 in positive obligations
- #3
PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.
$18,815,873 in positive obligations
Rankings use reported USAspending award data.
Did NASA contract obligations increase in the commercial and institutional building construction market?
Yes. Measured by net prime contract obligations, reported NASA activity in the commercial and institutional building construction market increased 168.4% from $67,559,080 in the preceding 12 months to $181,360,918 in the 12 months through September 10, 2026.
- Latest 12 months
- $181,360,918
- Net prime contract obligations
- Preceding 12 months
- $67,559,080
- Net prime contract obligations
- Change
- +168.4%
- Between matched 12-month periods
Reported contract actions, not outlays or a forecast.
What recent NASA contract award activity was reported in the commercial and institutional building construction market?
Recent NASA contract award activity reported in the commercial and institutional building construction market included actions for THRASH COMMERCIAL CONTRACTORS, INC., PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC., and IRONWOOD COMMERCIAL BUILDERS INC during the 12 months through September 10, 2026.
-
THRASH COMMERCIAL CONTRACTORS, INC. · PIID 80MSFC26C0016
Base award · August 27, 2026 · Action obligation: +$61,988,188
-
PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC. · PIID 80GRC025F7063
Base award · September 22, 2025 · Action obligation: +$7,882,089
-
IRONWOOD COMMERCIAL BUILDERS INC · PIID 80ARC026F7009
Base award · March 26, 2026 · Action obligation: +$3,966,060
-
APACHE ELECTRICAL CONTRACTORS INC · PIID 80MSFC26FA035
Base award · July 29, 2026 · Action obligation: +$6,000,000
-
IPI CONSTRUCTION · PIID 80ARC026FA033
Base award · June 24, 2026 · Action obligation: +$3,606,551
-
MADISON ELECTRIC INC · PIID 80MSFC25FA099
Base award · September 17, 2025 · Action obligation: +$2,950,000
Action obligations are transaction-level amounts, not current award-level obligations.
Which procurement methods were reported for NASA contracts under NAICS 236220?
From September 11, 2025 through September 10, 2026, NASA reported 182 positive-obligation awards for commercial and institutional building construction under NAICS 236220. The leading award type was delivery order. The leading reported procedure was ts.
- Positive-obligation awards
- 182
- Leading reported procedure
- Ts
- 34.3% of positive obligations
- Leading award type
- Delivery Order
- 64.6% of positive obligations
- Full and open
- 0.2%
- of positive obligations
- Reported parent IDV
- 64.6%
- of positive obligations
Percentages use positive obligations as the denominator.
Apply this research to a live pursuit
Sweetspot connects opportunity qualification, competitive research, capture, and proposal work in one workspace.
Related market research
Complete market indexes:
Same NAICS at other agencies:
Nearby NAICS at this agency:
Markets sharing leading prime records:
Leading-prime vehicle memberships:
Company memberships do not establish award-channel use.Reported obligations include contract actions from October 1, 2021 through September 10, 2026. Set-aside and business-size fields reflect award records, not a contractor's current eligibility.
Review data methodology