Federal Capture Intelligence

Top NASA commercial and institutional building construction contractors (NAICS 236220)

Latest 12 months
$181.4M
Net obligations · Up $113.8M vs. $67.6M preceding
Prime contractors
54
With positive obligations in the latest 12 months

Research the NASA federal contracting market for commercial and institutional building construction under NAICS 236220. Compare top federal contractors and market share, reported contract obligations and spending trends, funding-office attribution, recent award activity, and contract types, competition, and procurement methods.

Contract obligation trends for Commercial and Institutional Building Construction at the National Aeronautics and Space Administration

Federal records show $578.8M in net obligations across 857 awards in Commercial and Institutional Building Construction at the National Aeronautics and Space Administration from Oct 1, 2021 through Sep 10, 2026. This market accounts for 0.79% of $73.3B in agency-wide net prime contract obligations over the period shown. Latest 12-month net obligations increased 168.4% from $67.6M to $181.4M. 8 prime contractors accounted for at least 80% of positive obligations in that latest period.

Fiscal-year activity

FY26 is year-to-date through Sep 10, 2026; earlier years show complete fiscal-year totals.

FY26 year-to-date: $163.3M versus $59.8M through the same date in FY25 (+173.3%).
Net obligations · complete fiscal yearNet obligations · FY26 YTDContract actions
View fiscal-year data table
Fiscal yearNet obligationsContract actionsCoverage
FY2022$138.6M775Complete
FY2023$136.4M793Complete
FY2024$62.6M589Complete
FY2025$77.8M474Complete
FY2026$163.3M379YTD through Sep 10, 2026

Market at a glance

All reported prime contract awards
All-period net obligations
$578.8M
857 awards · 99 prime contractors
Latest 12-month movement
+168.4%
$181.4M vs. $67.6M
Leading eight prime share
81.7%
Share held by the eight leading prime contractors in the latest 12 months
View agency share, denominators, and set-aside reporting
Agency context
0.79% of $73.3B in agency-wide net obligations.
Set-aside share when reported
79.5% of 78 awards with reported set-aside status.
Set-aside reporting
62 set aside · 16 no set-aside · 779 not reported

What changed in the last 12 months?

Sep 11, 2025Sep 10, 2026, compared with Sep 11, 2024Sep 10, 2025.

Market structure

This market grew faster than 95.5% of comparable agency NAICS markets
+168.4%Agency median −0.9%
The agency comparison covers 33 comparable NAICS markets.
Reported set-aside share decreased
87.1%64.0%−23.1 percentage points
Of 25 latest-period awards with reported set-aside status, 16 were reported as set-asides.

Buyer demand

Reported obligations through NASA MARSHALL SPACE FLIGHT CENTER increased
$7.1M$78.2M+$71.1M
Latest-period activity spans 43 awards across 11 prime contractors.

Competitive shifts

MADISON ELECTRIC INC climbed the most in the contractor rankings
#25#13Up 12 places
The contractor accounts for 1.6% of positive obligations across 2 reported actions.
ERIE AFFILIATES INC lost the most market share
19.2%10.9%−8.3 percentage points
The contractor now ranks #2 by positive obligations, based on 70 reported actions.
THRASH COMMERCIAL CONTRACTORS, INC. was the largest newly observed contractor
$62.3MLatest 12-month obligations
First observed in this market on Aug 27, 2026, the contractor now ranks #1 by positive obligations across 2 reported actions.
View 6 additional material changes

Competitive shifts

PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC. had the largest increase in reported obligations
$3.8M$18.8M+$15.1M
The contractor now ranks #3 by positive obligations and accounts for 10.4% of positive obligations, based on 25 reported actions.
V.I.P. ELECTRIC COMPANY fell the most in the contractor rankings
#11#31Down 20 places
The contractor accounts for 0.010% of positive obligations across 1 reported action.
SEA PAC ENGINEERING INC had the largest decline in reported obligations
$1.8M$47K−$1.7M
The contractor now ranks #27 by positive obligations and accounts for 0.030% of positive obligations, based on 18 reported actions.

Award activity

Market structure

Top-five contractor share increased
63.7%68.8%+5.1 percentage points
Contractors outside the top five now account for 31.2% of positive obligations.

Buyer demand

Reported obligations through NASA LANGLEY RESEARCH CENTER decreased
$1.5M$243K−$1.2M
Latest-period activity spans 4 awards across 4 prime contractors.
How these findings are calculated

Findings are selected from matched-period changes in obligations, share, rank, funding offices, concentration, reported set-asides, material award actions, and agency-peer outliers. Related signals are combined, and only material evidence-backed changes are shown. Review the full methodology.

Federal contract obligations by funding office

See how positive obligations were attributed across funding offices in the 12 months ending Sep 10, 2026.

43.1% of positive obligations were attributed to NASA MARSHALL SPACE FLIGHT CENTER. That represents $78.2M, up $71.1M from the preceding 12 months.

Latest 12-month share of positive obligations; the gray segment represents all other reported offices.

  1. NASA MARSHALL SPACE FLIGHT CENTER43.1% · $78.2M · up $71.1M
  2. NASA GLENN RESEARCH CENTER28.9% · $52.4M · up $25.9M
  3. NASA KENNEDY SPACE CENTER13.5% · $24.4M · up $8.2M
  4. NASA ARMSTRONG FLIGHT RESEARCH CNTR7.8% · $14.1M · up $3.0M
  5. NASA AMES RESEARCH CENTER6.4% · $11.6M · up $6.1M
  6. All other reported offices0.36% of positive obligations
View reported office rankings, comparisons, and evidence

USAspending assigns each award to a funding office. That office may differ from the requiring activity, program office, contracting office, individual buyer, or actual customer.

  1. Reported funding office

    NASA MARSHALL SPACE FLIGHT CENTER

    #1Up 3 from #4

    Latest 12 months

    $78.2M

    43.1% of positive obligations

    Versus preceding 12 months

    +$71.1M

    11 active prime contractors · 43 awards

    View office comparison and evidence

    Reported obligations increased 1001.2% from $7.1M to $78.2M. The office’s share of positive obligations moved from 10.5% to 43.1%, a change of +32.7 percentage points.

    The latest period contains 53 actions across 43 awards and 3 newly active prime contractors. The preceding period contained 10 active prime contractors and 77 awards.

  2. Reported funding office

    NASA GLENN RESEARCH CENTER

    #2Down 1 from #1

    Latest 12 months

    $52.4M

    28.9% of positive obligations

    Versus preceding 12 months

    +$25.9M

    5 active prime contractors · 64 awards

    View office comparison and evidence

    Reported obligations increased 97.8% from $26.5M to $52.4M. The office’s share of positive obligations moved from 39.0% to 28.9%, a change of −10.2 percentage points.

    The latest period contains 165 actions across 64 awards. The preceding period contained 6 active prime contractors and 61 awards.

  3. Reported funding office

    NASA KENNEDY SPACE CENTER

    #3Down 1 from #2

    Latest 12 months

    $24.4M

    13.5% of positive obligations

    Versus preceding 12 months

    +$8.2M

    5 active prime contractors · 43 awards

    View office comparison and evidence

    Reported obligations increased 50.3% from $16.3M to $24.4M. The office’s share of positive obligations moved from 24.0% to 13.5%, a change of −10.5 percentage points.

    The latest period contains 68 actions across 43 awards and 2 newly active prime contractors. The preceding period contained 4 active prime contractors and 50 awards.

  4. Reported funding office

    NASA ARMSTRONG FLIGHT RESEARCH CNTR

    #4Down 1 from #3

    Latest 12 months

    $14.1M

    7.8% of positive obligations

    Versus preceding 12 months

    +$3.0M

    30 active prime contractors · 41 awards

    View office comparison and evidence

    Reported obligations increased 26.8% from $11.1M to $14.1M. The office’s share of positive obligations moved from 16.4% to 7.8%, a change of −8.6 percentage points.

    The latest period contains 58 actions across 41 awards and 25 newly active prime contractors. The preceding period contained 6 active prime contractors and 14 awards.

  5. Reported funding office

    NASA AMES RESEARCH CENTER

    #5Rank unchanged

    Latest 12 months

    $11.6M

    6.4% of positive obligations

    Versus preceding 12 months

    +$6.1M

    7 active prime contractors · 14 awards

    View office comparison and evidence

    Reported obligations increased 112.9% from $5.4M to $11.6M. The office’s share of positive obligations moved from 8.0% to 6.4%, a change of −1.6 percentage points.

    The latest period contains 53 actions across 14 awards and 3 newly active prime contractors. The preceding period contained 5 active prime contractors and 12 awards.

  6. Reported funding office

    NASA GODDARD SPACE FLIGHT CENTER

    #6New to the positive-obligation ranking

    Latest 12 months

    $409K

    0.23% of positive obligations

    Versus preceding 12 months

    +$707K

    2 active prime contractors · 2 awards

    View office comparison and evidence

    Reported obligations moved from $298K in net deobligations to $409K in net obligations. The office’s share of positive obligations moved from 0% to 0.23%, a change of +0.2 percentage points.

    The latest period contains 3 actions across 2 awards. The preceding period contained 5 active prime contractors and 6 awards.

  7. Reported funding office

    NASA LANGLEY RESEARCH CENTER

    #7Down 1 from #6

    Latest 12 months

    $243K

    0.13% of positive obligations

    Versus preceding 12 months

    −$1.2M

    4 active prime contractors · 4 awards

    View office comparison and evidence

    Reported obligations decreased 83.3% from $1.5M to $243K. The office’s share of positive obligations moved from 2.1% to 0.13%, a change of −2.0 percentage points.

    The latest period contains 18 actions across 4 awards and 1 newly active prime contractor. The preceding period contained 4 active prime contractors and 5 awards.

    Leading award-level changes

Contract types, competition, and procurement methods

From Sep 11, 2025 through Sep 10, 2026, 182 awards had positive obligations totaling $181.8M. Ts was the leading reported procedure, accounting for 34.3% of positive obligations. Awards with a reported parent IDV accounted for 64.6%.

Leading award type
64.6%
Delivery Order
Leading reported procedure
34.3%
Ts
Reported parent IDV
64.6%
of positive obligations had a reported parent IDV
Median reported offers
3
176 of 182 awards reported offers

Buying method changes

Compared with Sep 11, 2024Sep 10, 2025. Based on 182 current awards and 188 preceding awards with positive net obligations.

Leading reported procedure
Ts
Previously Subject to Multiple Award Fair Opportunity · 94.2% preceding vs 34.3% current
Parent-IDV obligation share
64.6%
Down from 95.5% in the preceding period
How to read these changes

Directional color and the Up or Down labels show historical movement only. Green does not mean favorable and red does not mean unfavorable; neither predicts a future procurement method.

Same-NAICS comparison

Compared with the NAICS 236220 peer median, parent-IDV obligation share is 32.1 percentage points higher, reported full-and-open obligation share is 9.5 percentage points lower, delivery-order obligation share is 38.3 percentage points higher, and median positive award obligations are 2.6% higher.

MeasureThis marketPeer medianDifference
Parent-IDV obligation share64.6%32.5%+32.1 pts
Reported full-and-open obligation share0.20%9.7%-9.5 pts
Delivery-order obligation share64.6%26.3%+38.3 pts
Median positive award obligations$160K$156K+2.6%
Peer cohort and comparison limits

The peer median gives each of the 16 eligible agency markets equal weight. The included agency markets are:

Agency mission, scale, and acquisition context can differ. Peer position does not establish market attractiveness or predict a future procurement method.

View buying-method details and data coverage

Award types

Reported valueAwardsPositive obligationsShare
Delivery Order(C)172$117.5M64.6%
Definitive Contract(D)6$63.0M34.6%
Purchase Order(B)4$1.3M0.73%

Reported parent-award types

Reported valueAwardsPositive obligationsShare
IDC(B)172$117.5M64.6%
Not reported10$64.3M35.4%

Single- or multiple-award parent structure

Reported valueAwardsPositive obligationsShare
Multiple Award(M)166$116.3M64.0%
Single Award(S)6$1.2M0.65%
Not reported10$64.3M35.4%

Solicitation procedures

Reported valueAwardsPositive obligationsShare
Ts(TWO STEP)1$62.3M34.3%
Subject to Multiple Award Fair Opportunity(MAFO)118$58.3M32.0%
Mafo(SUBJECT TO MULTIPLE AWARD FAIR OPPORTUNITY)48$58.1M31.9%
Negotiated Proposal/Quote(NP)7$2.1M1.2%
Np(NEGOTIATED PROPOSAL/QUOTE)3$393K0.22%
Two Step(TS)3$360K0.20%
Other reported values2$299K0.16%

Extent competed

Reported valueAwardsPositive obligationsShare
A(FULL AND OPEN COMPETITION)4$62.7M34.5%
Full and Open Competition After Exclusion of Sources(D)125$60.4M33.2%
D(FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES)48$58.1M31.9%
Full and Open Competition(A)3$360K0.20%
G(NOT COMPETED UNDER SAP)1$285K0.16%
Not Competed(C)1$14K0.010%

Fair-opportunity and limited-source reporting

Reported valueAwardsPositive obligationsShare
Fair Opportunity Given(FAIR)123$99.7M54.8%
Competitive Set Aside(CSA)12$15.3M8.4%
Follow-on Action Following Competitive Initial Action(FOO)5$1.3M0.72%
Minimum Guarantee(MG)26$26K0.010%
Not reported16$65.5M36.0%

Other-than-full-and-open reasons

Reported valueAwardsPositive obligationsShare
Authorized by Statute (FAR 6.302-5(A)(2)(I))(OTH)1$285K0.16%
Only One Source-Other (FAR 6.302-1 Other)(ONE)1$14K0.010%
Not reported180$181.5M99.8%

Contract pricing types

Reported valueAwardsPositive obligationsShare
J(FIRM FIXED PRICE)53$121.1M66.6%
Firm Fixed Price(J)129$60.8M33.4%

Product or Service Codes

Reported valueAwardsPositive obligationsShare
Construction of Office Buildings(Y1AA)3$62.5M34.4%
Construction of Government-Owned Government-Operated (Gogo) R&d Facilities(Y1HB)59$52.8M29.0%
Repair or Alteration of Office Buildings(Z2AA)42$24.2M13.3%
Construction of Miscellaneous Buildings(Y1JZ)26$16.0M8.8%
Repair or Alteration of Other Administrative Facilities and Service Buildings(Z2AZ)33$13.6M7.5%
Repair or Alteration of Miscellaneous Buildings(Z2JZ)16$12.3M6.7%
Other reported values3$570K0.31%

Awarding subagencies

Reported valueAwardsPositive obligationsShare
National Aeronautics and Space Administration(8000)179$181.5M99.8%
Public Buildings Service(4740)3$360K0.20%

Awarding offices

Reported valueAwardsPositive obligationsShare
NASA Marshall Space Flight Center(80MSFC)27$78.2M43.0%
NASA Glenn Research Center(80GRC0)59$52.8M29.0%
NASA Kennedy Space Center(80KSC0)43$24.4M13.4%
NASA Armstrong Flight Research Cntr(80AFRC)40$14.2M7.8%
NASA Ames Research Center(80ARC0)8$11.4M6.3%
NASA Goddard Space Flight Center(80GSFC)1$414K0.23%
Other reported values4$383K0.21%

Reported parent IDVs

Reported valueAwardsPositive obligationsShare
80GRC020D0009(8000)28$19.8M10.9%
80GRC020D0012(8000)8$18.8M10.3%
80KSC021DA005(8000)23$12.7M7.0%
80GRC020D0013(8000)8$9.6M5.3%
80AFRC26DA004(8000)1$8.9M4.9%
80KSC021DA002(8000)11$7.3M4.0%
80MSFC24DA003(8000)1$6.0M3.3%
80AFRC19D0004(8000)3$5.6M3.1%
Other reported values89$28.8M15.9%
Not reported10$64.3M35.4%

Offers, award size, and timing

Median reported offers
3 median
176 reported · 6 not reported
Positive award obligations
$160K median
$15K$557K middle 50%
Reported performance period
268 days (~9 months) median
182 reported · 0 not reported

Calculations group latest-period actions by award, retain awards with positive net obligations for share denominators, and use each award's latest reported USAspending procurement fields as of Sep 10, 2026. Blank competition, pricing, PSC, or parent-IDV values remain not reported; they are not inferred. Offer counts must be positive and below the FPDS 999 placeholder. Awarding organizations can differ from the funding agency that defines this page.

Top federal contractors

Latest 12-month market share, concentration, and complete prime contractor rankings across the period shown.

Prime contractor concentration
8 of 54prime contractors account for at least 80% of positive obligations in the last 12 months
Largest prime contractor
34.4%of positive obligations in the last 12 months
Leading four prime contractors
62.6%of positive obligations in the last 12 months
Leading eight prime contractors
81.7%of positive obligations in the last 12 months

Based on $181.5M in positive obligations during the 12 months ending Sep 10, 2026. Individual shares and movement appear in the searchable rankings below. Movement compares with Sep 11, 2024–Sep 10, 2025.

Last 12mo obligation volume: Highest positive obligations first; net deobligations follow by magnitude; contractors with no activity in the last 12 months follow by all-period obligations. Ranks use the complete contractor list and remain fixed when search narrows the results.

15 leading contractors
  1. #1

    Last 12mo obligations

    $62.3M

    34.4%

    Dollar movement

    +$62.3M

    vs. prior 12 months

    Last 12mo awards

    1 award

    2 actions

    Historical and award details for THRASH COMMERCIAL CONTRACTORS, INC.
    Obligations: prior → latest
    $0 → $62.3M
    Not comparable
    Share: prior → latest
    0% → 34.4%
    +34.4 percentage points
    All-period obligations
    $62.3M
    10.8% of all-period positive obligations · 1 award
    Recorded activity
    Since Aug 27, 2026
    through Sep 2, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside10
    Not reported00
    Reported small business00
    All-period set-aside types

    None reported.

  2. #2

    Last 12mo obligations

    $19.8M

    10.9%

    Dollar movement

    +$6.4M

    vs. prior 12 months

    Last 12mo awards

    30 awards

    70 actions

    Historical and award details for ERIE AFFILIATES INC
    Obligations: prior → latest
    $13.4M → $19.8M
    +47.4%
    Share: prior → latest
    19.2% → 10.9%
    −8.3 percentage points
    All-period obligations
    $71.3M
    12.3% of all-period positive obligations · 81 awards
    Recorded activity
    Since Oct 14, 2021
    through Sep 3, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside37
    Reported no set-aside00
    Not reported2721
    Reported small business3028
    All-period set-aside types
    • 16 · Total small business
  3. #3

    Last 12mo obligations

    $18.8M

    10.4%

    Dollar movement

    +$15.1M

    vs. prior 12 months

    Last 12mo awards

    9 awards

    25 actions

    Historical and award details for PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.
    Obligations: prior → latest
    $3.8M → $18.8M
    +401.3%
    Share: prior → latest
    5.4% → 10.4%
    +5.0 percentage points
    All-period obligations
    $56.9M
    9.8% of all-period positive obligations · 36 awards
    Recorded activity
    Since Oct 18, 2021
    through Sep 4, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside12
    Reported no set-aside00
    Not reported89
    Reported small business911
    All-period set-aside types
    • 11 · Total small business
  4. #4

    Last 12mo obligations

    $12.7M

    7.0%

    Dollar movement

    +$2.2M

    vs. prior 12 months

    Last 12mo awards

    23 awards

    31 actions

    Historical and award details for ALEUT CONSTRUCTION LLC
    Obligations: prior → latest
    $10.6M → $12.7M
    +20.6%
    Share: prior → latest
    15.1% → 7.0%
    −8.1 percentage points
    All-period obligations
    $26.6M
    4.6% of all-period positive obligations · 49 awards
    Recorded activity
    Since Feb 6, 2023
    through Sep 3, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside27
    Reported no set-aside00
    Not reported2116
    Reported small business2323
    All-period set-aside types
    • 8 · 8(a) competed
  5. #5

    Last 12mo obligations

    $11.2M

    6.2%

    Dollar movement

    +$1.5M

    vs. prior 12 months

    Last 12mo awards

    4 awards

    13 actions

    Historical and award details for ANNA LISA LUNA CONSTRUCTION, INC.
    Obligations: prior → latest
    $9.7M → $11.2M
    +15.0%
    Share: prior → latest
    14.0% → 6.2%
    −7.8 percentage points
    All-period obligations
    $22.1M
    3.8% of all-period positive obligations · 7 awards
    Recorded activity
    Since Nov 30, 2021
    through Aug 31, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside22
    Reported no set-aside00
    Not reported22
    Reported small business44
    All-period set-aside types
    • 3 · Total small business
    • 2 · 8(a) competed
  6. #6

    Last 12mo obligations

    $9.6M

    5.3%

    Dollar movement

    +$4.6M

    vs. prior 12 months

    Last 12mo awards

    9 awards

    19 actions

    Historical and award details for R.J. RUNGE COMPANY, INC.
    Obligations: prior → latest
    $5.0M → $9.6M
    +91.7%
    Share: prior → latest
    7.2% → 5.3%
    −1.9 percentage points
    All-period obligations
    $48.2M
    8.3% of all-period positive obligations · 30 awards
    Recorded activity
    Since Nov 8, 2021
    through Sep 4, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside00
    Not reported99
    Reported small business99
    All-period set-aside types
    • 3 · Total small business
  7. #7

    Last 12mo obligations

    $7.6M

    4.2%

    Dollar movement

    +$2.1M

    vs. prior 12 months

    Last 12mo awards

    12 awards

    27 actions

    Historical and award details for WRIGHT BROS LLC
    Obligations: prior → latest
    $5.4M → $7.6M
    +39.2%
    Share: prior → latest
    7.8% → 4.2%
    −3.6 percentage points
    All-period obligations
    $43.1M
    7.4% of all-period positive obligations · 43 awards
    Recorded activity
    Since Jan 14, 2022
    through Sep 1, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside24
    Reported no set-aside00
    Not reported1015
    Reported small business1219
    All-period set-aside types
    • 3 · 8(a) competed
    • 1 · 8(a) sole source
  8. #8

    Last 12mo obligations

    $6.4M

    3.5%

    Dollar movement

    +$1.1M

    vs. prior 12 months

    Last 12mo awards

    19 awards

    54 actions

    Historical and award details for PPW BUILDERS INC
    Obligations: prior → latest
    $5.3M → $6.4M
    +20.4%
    Share: prior → latest
    7.6% → 3.5%
    −4.1 percentage points
    All-period obligations
    $14.5M
    2.5% of all-period positive obligations · 32 awards
    Recorded activity
    Since Nov 5, 2021
    through Sep 2, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside00
    Not reported1912
    Reported small business1912
    All-period set-aside types

    None reported.

  9. #9

    Last 12mo obligations

    $6.0M

    3.3%

    Dollar movement

    +$4.6M

    vs. prior 12 months

    Last 12mo awards

    5 awards

    6 actions

    Historical and award details for APACHE ELECTRICAL CONTRACTORS INC
    Obligations: prior → latest
    $1.4M → $6.0M
    +335.9%
    Share: prior → latest
    2.0% → 3.3%
    +1.3 percentage points
    All-period obligations
    $10.9M
    1.9% of all-period positive obligations · 50 awards
    Recorded activity
    Since Oct 21, 2021
    through Jul 29, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside00
    Not reported510
    Reported small business510
    All-period set-aside types

    None reported.

  10. #10

    Last 12mo obligations

    $5.6M

    3.1%

    Dollar movement

    +$5.4M

    vs. prior 12 months

    Last 12mo awards

    4 awards

    18 actions

    Historical and award details for IRONWOOD COMMERCIAL BUILDERS INC
    Obligations: prior → latest
    $212K → $5.6M
    +2531.7%
    Share: prior → latest
    0.30% → 3.1%
    +2.8 percentage points
    All-period obligations
    $9.1M
    1.6% of all-period positive obligations · 6 awards
    Recorded activity
    Since Jan 12, 2022
    through Sep 1, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside00
    Not reported42
    Reported small business42
    All-period set-aside types

    None reported.

  11. #11

    Last 12mo obligations

    $3.6M

    2.0%

    Dollar movement

    +$3.6M

    vs. prior 12 months

    Last 12mo awards

    1 award

    1 action

    Historical and award details for IPI CONSTRUCTION
    Obligations: prior → latest
    $0 → $3.6M
    Not comparable
    Share: prior → latest
    0% → 2.0%
    +2.0 percentage points
    All-period obligations
    $3.6M
    0.62% of all-period positive obligations · 1 award
    Recorded activity
    Since Jun 24, 2026
    through Jun 24, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside10
    Reported no set-aside00
    Not reported00
    Reported small business10
    All-period set-aside types
    • 1 · Total small business
  12. #12

    Last 12mo obligations

    $3.0M

    1.6%

    Dollar movement

    −$379K

    vs. prior 12 months

    Last 12mo awards

    7 awards

    20 actions

    Historical and award details for LEAD BUILDERS INC
    Obligations: prior → latest
    $3.4M → $3.0M
    −11.2%
    Share: prior → latest
    4.8% → 1.6%
    −3.2 percentage points
    All-period obligations
    $40.9M
    7.1% of all-period positive obligations · 11 awards
    Recorded activity
    Since Feb 2, 2022
    through Jul 15, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside22
    Reported no set-aside00
    Not reported54
    Reported small business76
    All-period set-aside types
    • 1 · 8(a) competed
    • 1 · Total small business
  13. #13

    Last 12mo obligations

    $3.0M

    1.6%

    Dollar movement

    +$2.9M

    vs. prior 12 months

    Last 12mo awards

    2 awards

    2 actions

    Historical and award details for MADISON ELECTRIC INC
    Obligations: prior → latest
    $79K → $3.0M
    +3658.3%
    Share: prior → latest
    0.11% → 1.6%
    +1.5 percentage points
    All-period obligations
    $4.4M
    0.75% of all-period positive obligations · 18 awards
    Recorded activity
    Since Nov 8, 2021
    through Jun 24, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside00
    Not reported25
    Reported small business25
    All-period set-aside types

    None reported.

  14. #14

    Last 12mo obligations

    $2.3M

    1.3%

    Dollar movement

    +$1.3M

    vs. prior 12 months

    Last 12mo awards

    4 awards

    4 actions

    Historical and award details for BACIK GROUP LLC
    Obligations: prior → latest
    $1.0M → $2.3M
    +121.9%
    Share: prior → latest
    1.5% → 1.3%
    −0.2 percentage points
    All-period obligations
    $6.3M
    1.1% of all-period positive obligations · 37 awards
    Recorded activity
    Since Nov 8, 2021
    through Sep 2, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside00
    Not reported418
    Reported small business418
    All-period set-aside types

    None reported.

  15. #15

    Last 12mo obligations

    $1.9M

    1.0%

    Dollar movement

    +$1.9M

    vs. prior 12 months

    Last 12mo awards

    3 awards

    3 actions

    Historical and award details for ALEUT CONSTRUCTION LLC
    Obligations: prior → latest
    $0 → $1.9M
    Not comparable
    Share: prior → latest
    0% → 1.0%
    +1.0 percentage points
    All-period obligations
    $1.9M
    0.33% of all-period positive obligations · 3 awards
    Recorded activity
    Since Sep 4, 2026
    through Sep 8, 2026

    Award reporting

    Latest and prior 12-month award reporting
    Reported award evidenceLatestPrior
    Reported set-aside00
    Reported no set-aside00
    Not reported30
    Reported small business30
    All-period set-aside types

    None reported.

Recent federal contract award activity

Recent contract actions with unusually large obligation changes or meaningful shifts in contractor and funding-office activity.

Base award

This action

+$62.0M

THRASH COMMERCIAL CONTRACTORS, INC.

NASA MARSHALL SPACE FLIGHT CENTER

DESIGN-BUILD SERVICES FOR THE COMPLETE DESIGN AND CONSTRUCTION FOR THE MARSHALL EXPLORATION FACILITY (MEF)

Why it stands out

One action equaled more than a third of the market’s latest 12-month positive obligations.

The $62.0M action represented 34.2% of the market’s positive obligations over the latest 12 months.

Award net obligations
$62.3M
Share of 12-month positive obligations
34.2%
Supporting data
Prime contractor
#1 · 34.4% share
Newly active in this market; no actions were reported in the preceding 12 months
Funding office
#1 · 43.1% attributed share
up 3 ranks · +32.7 percentage points · $71.1M net increase; action accounted for 87.2%
PIID 80MSFC26C0016
Base award

This action

+$7.9M

PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.

NASA GLENN RESEARCH CENTER

PROJECT 33233 ATF CRYOGENIC FACILITY

Why it stands out

The contractor climbed 4 positions in this market.

It now ranks #3 by positive obligations over the latest 12 months.

Award net obligations
$9.5M
Share of 12-month positive obligations
4.3%
Supporting data
Prime contractor
#3 · 10.4% share
up 4 ranks · +5.0 percentage points · $15.1M net increase; action accounted for 52.3%
Funding office
#2 · 28.9% attributed share
down 1 rank · −10.2 percentage points · $25.9M net increase; action accounted for 30.4%
PIID 80GRC025F7063
Base award

This action

+$4.0M

IRONWOOD COMMERCIAL BUILDERS INC

NASA AMES RESEARCH CENTER

N239 CHILLER REPLACEMENT AND 2 COOLING TOWERS

Why it stands out

The contractor climbed 12 positions in this market.

It now ranks #10 by positive obligations over the latest 12 months.

Award net obligations
$4.0M
Share of 12-month positive obligations
2.2%
Supporting data
Prime contractor
#10 · 3.1% share
up 12 ranks · +2.8 percentage points · $5.4M net increase; action accounted for 74.0%
Funding office
#5 · 6.4% attributed share
−1.6 percentage points · $6.1M net increase; action accounted for 64.7%
PIID 80ARC026F7009
Base award

This action

+$6.0M

APACHE ELECTRICAL CONTRACTORS INC

NASA MARSHALL SPACE FLIGHT CENTER

MINOR CONSTRUCTION TASK ORDER

Why it stands out

The contractor climbed 3 positions in this market.

It now ranks #9 by positive obligations over the latest 12 months.

Award net obligations
$6.0M
Share of 12-month positive obligations
3.3%
Supporting data
Prime contractor
#9 · 3.3% share
up 3 ranks · +1.3 percentage points · $4.6M net increase; action exceeded it by $1.4M
PIID 80MSFC26FA035
Base award

This action

+$3.6M

IPI CONSTRUCTION

NASA AMES RESEARCH CENTER

WRMACC NOR CAL SEED PROJECT FOR HVAC REMOVAL AND REPLACEMENT N254

Why it stands out

No activity for this contractor was reported in this market during the preceding 12 months.

The base action placed the contractor #11 in this market by positive obligations over the latest 12 months.

Award net obligations
$3.6M
Share of 12-month positive obligations
2.0%
Supporting data
Prime contractor
#11 · 2.0% share
Newly active in this market; no actions were reported in the preceding 12 months
PIID 80ARC026FA033
Base award

This action

+$3.0M

MADISON ELECTRIC INC

NASA MARSHALL SPACE FLIGHT CENTER

MINOR CONSTRUCTION TASK ORDER TO REVITALIZE THE ELECTRICAL SYSTEM IN BUILDING 4583 PER FWR R001108345 IFB PACKAGE.

Why it stands out

The contractor climbed 12 positions in this market.

It now ranks #13 by positive obligations over the latest 12 months.

Award net obligations
$3.0M
Share of 12-month positive obligations
1.6%
Supporting data
Prime contractor
#13 · 1.6% share
up 12 ranks · +1.5 percentage points · $2.9M net increase; action exceeded it by $74K
PIID 80MSFC25FA099
View recent award activity by date (10)
  1. Action+$27K
    Award net obligations$27K
  2. Action+$678K
    Award net obligations$678K
  3. Action+$937K
    Award net obligations$937K
  4. Action+$280K
    Award net obligations$280K
  5. Action+$210K
    Award net obligations$567K
  6. Action+$160K
    Award net obligations$2.0M
  7. Action+$2.6M
    Award net obligations$2.6M
  8. Action+$154K
    Award net obligations$6.1M
  9. Action+$36K
    Award net obligations$281K
  10. Action+$33K
    Award net obligations$1.1M

NASA commercial and institutional building construction market FAQs

Answers based on reported federal contract data.

Who are the top NASA commercial and institutional building construction contractors?

In the 12 months through September 10, 2026, THRASH COMMERCIAL CONTRACTORS, INC., ERIE AFFILIATES INC, and PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC. were the leading NASA commercial and institutional building construction prime contractors by positive obligations.

  1. #1

    THRASH COMMERCIAL CONTRACTORS, INC.

    $62,338,188 in positive obligations

  2. #2

    ERIE AFFILIATES INC

    $19,760,310 in positive obligations

  3. #3

    PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC.

    $18,815,873 in positive obligations

Rankings use reported USAspending award data.

Did NASA contract obligations increase in the commercial and institutional building construction market?

Yes. Measured by net prime contract obligations, reported NASA activity in the commercial and institutional building construction market increased 168.4% from $67,559,080 in the preceding 12 months to $181,360,918 in the 12 months through September 10, 2026.

Latest 12 months
$181,360,918
Net prime contract obligations
Preceding 12 months
$67,559,080
Net prime contract obligations
Change
+168.4%
Between matched 12-month periods

Reported contract actions, not outlays or a forecast.

What recent NASA contract award activity was reported in the commercial and institutional building construction market?

Recent NASA contract award activity reported in the commercial and institutional building construction market included actions for THRASH COMMERCIAL CONTRACTORS, INC., PINNACLE CONSTRUCTION DEVELOPMENT GROUP, INC., and IRONWOOD COMMERCIAL BUILDERS INC during the 12 months through September 10, 2026.

Action obligations are transaction-level amounts, not current award-level obligations.

Which procurement methods were reported for NASA contracts under NAICS 236220?

From September 11, 2025 through September 10, 2026, NASA reported 182 positive-obligation awards for commercial and institutional building construction under NAICS 236220. The leading award type was delivery order. The leading reported procedure was ts.

Positive-obligation awards
182
Leading reported procedure
Ts
34.3% of positive obligations
Leading award type
Delivery Order
64.6% of positive obligations
Full and open
0.2%
of positive obligations
Reported parent IDV
64.6%
of positive obligations

Percentages use positive obligations as the denominator.

Apply this research to a live pursuit

Sweetspot connects opportunity qualification, competitive research, capture, and proposal work in one workspace.

See Sweetspot in action

Leading-prime vehicle memberships:

Company memberships do not establish award-channel use.

Reported obligations include contract actions from October 1, 2021 through September 10, 2026. Set-aside and business-size fields reflect award records, not a contractor's current eligibility.

Review data methodology