Federal NAICS Codes

NAICS 221310: Water Supply and Irrigation Systems

Explore obligations, trends, recent awards, and incumbent contractors for NAICS 221310.

NAICS 221310 federal market metrics

Total obligations
$9.3B
Total awards
20,153 awards
Active obligations
$5.6B
Size standard
$41,000,000 receipts

What this NAICS covers

NAICS 221310 covers operation and maintenance of water supply and irrigation systems including treatment, pumping, storage, transmission, distribution, meter management, and delivery services that provide potable water and agricultural irrigation water to customers and service areas.

Federal opportunities under 221310 typically involve managing and operating water or irrigation systems to ensure continuous treated water delivery, system monitoring, pumping and storage operations, maintenance, regulatory reporting, water quality testing, and rapid response to system failures.

FY2025 snapshot

Obligations
$283.7M
Awards
783
Average award
$362.4K
Change from FY2024
+124.2%

Recent awards

Search contractors

$80,000

GULFPORT, CITY OF

Departmental Offices

PIID
140D0426C0112
PSC
S114 - UTILITIES- WATER

$42,000

DAVCHEM EAST AFRICA LIMITED

Department of State

PIID
19EK2026P0258
PSC
H146 - QUALITY CONTROL- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT

$19,440

MULTISTACK LLC

Department of State

PIID
19CB6026F0325
PSC
Z1EB - MAINTENANCE OF MAINTENANCE BUILDINGS

$132,250

AARON M SALAZAR

US Coast Guard

PIID
70Z02926PGALV0048
PSC
J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT

$37,208

MARVEL WATER LLC

Department of Veterans Affairs

PIID
36C26126P0910
PSC
4610 - WATER PURIFICATION EQUIPMENT

$39,245

DIAL GENERAL ENGINEERING

Department of Veterans Affairs

PIID
36C78626P0049
PSC
Z2NZ - REPAIR OR ALTERATION OF OTHER UTILITIES

FAQ

What work fits NAICS 221310?
  • Emergency repair and isolation of distribution mains to restore service, including valve operation, temporary bypass pumping, and pressure testing.
  • Design and rehabilitation of distribution pipeline segments with cleaning, lining or replacement, pressure testing, and as-built drawings for acceptance.
  • Installation or replacement of pump station equipment and controls with startup testing, vibration reports, and operations training for plant staff.
  • Telemetry and SCADA upgrades including PLC programming, sensor installation, system integration, and delivery of interface documentation and O&M manuals.
When is NAICS 221310 a weak fit?
  • Stormwater conveyance and detention system projects - focus on runoff management, culverts, and detention basins rather than potable supply or irrigation distribution.
  • Groundwater well drilling and well construction contracts - drilling and well completion without associated treatment, distribution, or storage works.
  • Wastewater collection and treatment services - sanitary sewer lines and treatment plant processes fall outside potable supply and irrigation system scope.
What solicitation language points to NAICS 221310?
  • Performance requirements specify hydraulic performance metrics such as pressure or residual disinfectant thresholds and allowable leakage or unaccounted-for-water limits.
  • Deliverables call for as-built pipeline drawings, pressure test certificates, reservoir inspection reports, and O&M manuals.
  • Labor categories list water treatment operators, pump technicians, pipeline crews, and SCADA programmers with specified certifications.

Put this market knowledge to work

Now that you know about NAICS 221310 - Water Supply and Irrigation Systems, let Sweetspot help you find and win relevant government contracts with AI-powered tools.