Federal NAICS Codes

NAICS 221122

Electric Power Distribution

Explore obligations, trends, recent awards, and incumbent contractors for NAICS 221122.

NAICS 221122 federal market metrics

Total obligations
$27.9B
Total awards
28,116 awards
Active obligations
$5.4B
Size standard
1,100 employees

What this NAICS covers

NAICS 221122 covers electric power distribution operations including managing distribution networks, maintaining substations and feeders, operating transformers and switches, performing line maintenance and outages response, and restoring energized service to end users.

Federal opportunities under 221122 typically involve ensuring reliable delivery of electricity to federal facilities through routine and emergency distribution work, planned upgrades, outage restoration, vegetation management, metering, and compliance with safety and service performance requirements.

FY2025 snapshot

Obligations
$572M
Awards
797
Average award
$717.7K
Change from FY2024
-4.9%

Recent awards

Search contractors

$100,000

AMEREN SERVICES COMPANY

Federal Prison System / Bureau of Prisons

PIID
15B41126F00000130
PSC
S112 - UTILITIES- ELECTRIC

FAQ

What work fits NAICS 221122?
  • Storm-response and outage restoration contracts supplying linemen, supervisors, and equipment for restoring distribution feeders and service drops.
  • Scheduled replacement of poles, crossarms, and overhead conductors with materials procurement, traffic control, and pole testing documentation.
  • Replacement and testing of distribution transformers including removal, installation, oil testing, and commissioning documentation.
  • Installation, calibration, and integration of distribution-level metering and SCADA endpoints with vendor-accepted commissioning and handover to the utility operations center.
When is NAICS 221122 a weak fit?
  • Transmission system upgrades where the scope includes high-voltage interstate lines, large transmission transformers, and bulk power system planning that exceed distribution-level equipment and local-service territory responsibilities.
  • Power generation construction that focuses on turbines, generators, plant balance-of-plant, fuel handling, and plant commissioning rather than distribution network operation and maintenance.
  • Retail billing systems or customer account management that center on IT systems, billing platforms, and customer service processes rather than physical distribution infrastructure and field crews.
What solicitation language points to NAICS 221122?
  • Scope lists deliverables such as feeder restoration, pole and transformer replacement, vegetation management, and storm-response crews with mobile equipment.
  • Labor categories specify lineman, foreman, troubleman, and live-line technicians with contractor payroll and on-call rotation requirements.
  • Performance requirements include outage restoration timeframes, required crew response windows, protective relaying commissioning, and distribution-level SCADA or metering integration tasks.