Federal NAICS Codes

NAICS 221111

Hydroelectric Power Generation

Explore obligations, trends, recent awards, and incumbent contractors for NAICS 221111.

NAICS 221111 federal market metrics

Total obligations
$678.4M
Total awards
654 awards
Active obligations
$4.6M
Size standard
750 employees

What this NAICS covers

NAICS 221111 covers generating electric power using hydropower facilities, including operation of dams, turbines, and associated electrical generation equipment for water-driven energy production and grid delivery.

Federal opportunities under 221111 typically involve operating and maintaining hydroelectric units, performing turbine and generator maintenance, coordinating plant output with grid dispatch, executing unit start/stop procedures, and delivering measurable megawatt-hours under operational reliability requirements.

FY2025 snapshot

Obligations
$65.9K
Awards
6
Average award
$11K
Change from FY2024
-83.8%

Recent awards

Search contractors

$775,894

L & S ELECTRIC INC

Bureau of Reclamation

PIID
140R2026P0034
PSC
Z2MD - REPAIR OR ALTERATION OF EPG FACILITIES - HYDRO

$2,294

FASTENAL COMPANY

Defense Logistics Agency

PIID
SPMYM225P2593
PSC
5305 - SCREWS

$20,839

COMMONWEALTH EDISON CO

Federal Bureau of Investigation

PIID
15F06725C0000857
PSC
S112 - UTILITIES- ELECTRIC

$23,875

SHEARGOLD LIMITED

Department of State

PIID
19BY7025P0172
PSC
3419 - MISCELLANEOUS MACHINE TOOLS

$14,500

INFRANERGY LLC

Department of State

PIID
19MX5225P0069
PSC
J059 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS

FAQ

What work fits NAICS 221111?
  • Operate a government-owned hydroelectric plant conducting day-to-day unit dispatch, load balancing, equipment monitoring, and generation accounting.
  • Perform scheduled and corrective maintenance on turbines, generators, governors, and switchgear as part of long-term hydroelectric operations.
  • Provide routine plant operations including unit synchronization, metered energy reporting, and coordination with grid dispatch for load-following and peaking requirements.
  • Manage reservoir release procedures tied to generation schedules, ensuring turbine operation, generation metering, and recordkeeping for delivered megawatt-hours.
When is NAICS 221111 a weak fit?
  • Civil construction for dam, spillway, or intake works where the primary deliverable is construction rather than ongoing electricity production and plant operation.
  • Power systems engineering or design studies that develop plans and specifications but do not include sustained operation, generation, or metered energy delivery.
  • Water resource management or flood control contracts focused on water regulation without requirements to operate turbines or produce metered electric power.
What solicitation language points to NAICS 221111?
  • Performance metrics specify unit availability, forced outage rate limits, or minimum plant capacity factor and require metered energy delivery reports.
  • SOW lists labor categories such as plant operator, turbine mechanic, or electrical technician and requires certified operator staffing for continuous generation shifts.
  • Deliverables include synchronized generation schedules, coordination with grid dispatch, daily generation logs, and maintenance records for turbines and generators.

Put this market knowledge to work

Now that you know about NAICS 221111 - Hydroelectric Power Generation, let Sweetspot help you find and win relevant government contracts with AI-powered tools.